Download Print this page

ABB J2013001 Quick Start Manual page 3

1u stackable distribution shelf - 19 in rack mount

Advertisement

QUICK START GUIDE
Step 4 - Connect Shelf DC
2 Adjacent shelves
Step 5 - Connect Communication Wires
Connectors are on the rear of the shelf.
1.
Connect alarm cable between Primary Distribution Shelf and adjacent Primary Rectifier Shelf (with controller)
(if present) - cable provided.
2.
Connect alarm cables between all Distribution Shelves.
SPS System
Page 3
© 2021 ABB. All rights reserved.
(continued)
Dual Lug Landings
(stand-alone Shelf)
Inter-shelf bus
Supplemental Distribution
Shelves
Alarm Cable Shelf
to Shelf
Primary Distribution
Shelf
Primary Rectifier Shelf
(with Controller)
Alarm Cable Primary
Distribution Shelf to
Primary Rectifier Shelf
RETURN bus Connections
covers shown
-48V bus Connections
covers removed
NE or CP System

Advertisement

loading