ABB J2013001 Quick Start Manual page 7

1u stackable distribution shelf - 19 in rack mount

Advertisement

QUICK START GUIDE
Step 11 - Install Breakers and Fuses
4.
Remove cover knockouts for installed positions.
5.
Replace Cover (2 thumb screws)
6.
Turn each Breaker ON
Snapak Breakers
1.
Remove Cover (2 thumb screws)
2.
Verify that each Breaker is OFF.
3.
Insert each Breaker fully into its position
oriented with ON position at top.
4.
Remove cover knockouts for installed positions.
5.
Replace Cover (2 thumb screws)
6.
Turn each Breaker ON
GMT Style Fuses
1.
Insert each GMT style fuse fully into its position
oriented as shown.
Page 7
© 2021 ABB. All rights reserved.
(continued)
Load Breaker Positions
Breaker
Guard
Orientation
Breaker Retention Covers
Battery or Load
Breaker Positions
Breaker Guard Orientation
Right Positions