FusionPower6000 3.0
User Manual (Not Against a Wall)
Issue
03
Date
2023-02-08
HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei FusionPower6000 3.0

  • Page 1 FusionPower6000 3.0 User Manual (Not Against a Wall) Issue Date 2023-02-08 HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei Digital Power Technologies Co., Ltd. and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: About This Document

    Indicates a potentially hazardous situation which, if not avoided, could result in equipment damage, data loss, performance deterioration, or unanticipated results. NOTICE is used to address practices not related to personal injury. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 4 Secondary Circuit Cables. ● Updated 5.2 Performing Insulation and Dielectric Strength Tests. 2022-07-18 Added the insulation and dielectric strength test methods. 2022-05-15 This issue is the first official release. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 5: Table Of Contents

    2.5 Component Description..............................54 2.5.1 PAD......................................54 2.5.2 ECC800-Pro..................................58 2.5.3 Smart ETH Gateway................................. 65 2.5.4 Centralized Monitoring Module........................... 67 2.5.5 Branch Monitoring Module............................70 3 Technical Specifications....................... 72 3.1 FusionPower6000.................................. 72 Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 6 5.4 Commissioning a UPS............................... 162 5.4.1 Power-On................................... 162 5.4.2 Initial Startup..................................163 5.4.3 Setting Dry Contact Parameters..........................166 5.4.4 Setting Communications Parameters........................166 5.4.5 Starting the Inverter...............................166 5.4.6 Powering On Loads................................ 167 Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 7 6.6.6 Exporting and Importing a Configuration File...................... 208 6.7 Setting the S-ECO Mode for a UPS..........................209 6.8 Transferring a UPS to Bypass Mode Manually......................214 A Lifting Trolley........................215 B Acronyms and Abbreviations................... 217 Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 8: Safety Information

    Equipment damage due to force majeure such as earthquakes, floods, volcanic eruptions, debris flows, lightning strikes, fires, wars, armed conflicts, typhoons, hurricanes, tornadoes, and extreme weather conditions ● Operation beyond the conditions specified in this document Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 9: Personal Safety

    D ANGER Before operations, remove conductive objects such as watches, bracelets, bangles, rings, and necklaces to prevent electric shocks. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 10 In the case of a fire, immediately leave the building or the equipment area and activate the fire alarm or call emergency services. Do not enter the affected building or equipment area under any circumstances. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 11: Equipment Safety

    Tier 4 or 3 power architecture specified in TIA-942 Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 12: Battery Safety

    To avoid battery short circuits, do not maintain batteries with power Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 13 CO and H . To prevent fire or device corrosion, ensure that flammable gas is properly exhausted. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 14 Loose screw connections will result in excessive voltage drops and batteries may catch fire when the current is high. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 15 You use batteries of different types together, causing acceleration of capacity attenuation. For example, you use our batteries together with batteries of other vendors or with batteries of different rated capacity. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 16 Otherwise, a battery alarm will be generated and batteries may be damaged. ● Before unpacking batteries, check whether the packaging is intact. Do not use batteries with damaged packaging. If any damage is found, notify the carrier and manufacturer immediately. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 17 Electrolyte is corrosive and can cause irritation and chemical burns. Should you come into direct contact with the battery electrolyte, do as follows: Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 18 The battery room should be equipped with fire extinguishers filled with halogenatedane, heptafluoropropane, perfluorohexanone, carbon dioxide, or dry powder. Each fire protection unit should be equipped with at least two fire extinguishers, which should be checked and replaced periodically. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 19 If batteries are out of service life, contact a battery recycling company for disposal. ● Do not expose waste batteries to high temperatures or direct sunlight. ● Do not place waste batteries in environments with high humidity or corrosive substances. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 20: Medium-Voltage Equipment Safety

    ● After the transformer cabinet is installed, strictly check the reliability of the grounding system to ensure that the grounding is safe and reliable. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 21: Electrical Safety

    WARNING For the equipment that needs to be grounded, install the ground cable first when installing the equipment and remove the ground cable last when removing the equipment. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 22 (The marks should cross the edges of the bolts.) ● After the installation is complete, ensure that protective cases, insulation tubes, and other necessary items for all electrical components are in position to avoid electric shocks. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 23 60332-3-22 (ZB) or higher requirements. ● When routing power cables, ensure that there is no coiling or twisting. Do not join or weld power cables. If necessary, use a longer cable. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 24 When touching the equipment and handling boards, modules with exposed circuit boards, or application-specific integrated circuits (ASICs), observe ESD protection regulations and wear ESD clothing and ESD gloves or a well- grounded ESD wrist strap. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 25: Environmental Requirements

    Ensure that no liquid enters the equipment to prevent faults or short circuits. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 26 All cable holes should be sealed. Seal the used cable holes with sealing putty. Seal the unused cable holes with the caps delivered with the equipment. The following figure shows the criteria for correct sealing with sealing putty. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 27: Mechanical Safety

    Otherwise, tipping or falling cabinets may cause bodily injury and equipment damage. WARNING When pulling equipment out of a cabinet, be aware of unstable or heavy objects in the cabinet to prevent injury. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 28 Move a heavy object stably with balanced force at an even and low speed. Put down the object stably and slowly to prevent any collision or drop from scratching the surface of the equipment or damaging the components and cables. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 29 Personnel involving working at heights are not allowed to throw objects from the height to the ground, or vice versa. Objects should be transported by slings, hanging baskets, highline trolleys, or cranes. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 30 If a single ladder is used, the recommended angle for the ladder against the floor is 75 degrees, as shown in the following figure. A square can be used to measure the angle. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 31 Do not drag steel ropes and hoisting tools or bump hoisted objects against hard objects during hoisting. ● Ensure that the angle between two hoisting ropes is no more than 90 degrees, as shown in the following figure. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 32 To avoid short circuits or other risks, do not drill holes into buried pipes or cables. ● When drilling holes, protect the equipment from shavings. After drilling, clean up any shavings. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 33: Product Overview

    FusionPower6000 for IT Load The FusionPower6000 supplies power to IT equipment through dense busways or feeder cabinets. If dense busways are used, feeder cabinets are not required in the FusionPower6000. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 34 (indirect evaporative cooling systems or terminal units of chilled water air conditioners) through dense busways or feeder cabinets. If dense busways are used for output, feeder cabinets are not required in the FusionPower6000. Figure 2-2 Networking application Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 35: Typical Configurations

    Figure 2-3 Layout from left to right (1) Transformer cabinet (2) Cable inlet and bus tie (3) Compensation cabinet cabinet (4) IT UPSs (5) IT maintenance bypass (6) IT feeder cabinets cabinet Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 36 Figure 2-5 Layout from left to right (1) Transformer cabinet (2) Cable inlet and bus tie (3) Compensation cabinet cabinet (4) IT UPSs (5) IT maintenance bypass (6) IT feeder cabinets cabinet Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 37: System Description

    The power supply and distribution system of the FusionPower6000 consists of the transformer, cable inlet switch, bus tie switch, static var generator (SVG) and active power filter (APF) compensation modules, UPS, maintenance bypass switch, and feeder switch. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 38 Figure 2-7 System architecture of the FusionPower6000 for IT load Figure 2-8 System architecture of the FusionPower6000 for IT and mechanical loads Electrical Architecture The FusionPower6000 supports the 2N, DR, and N+R electrical architectures. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 39: Monitoring System

    Figure 2-11 N+R electrical architecture (using 3+1 as an example) NO TE STS is short for static transfer switch. 2.3.2 Monitoring System The FusionPower6000 is centrally managed using the ECC800-Pro and PAD. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 40 Method 2: Connect to the DC Manager through a wired network to remotely view the device status. ● Method 3: Connect to the DC Manager through 4G wireless communication to remotely view the device status. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 41: Cabinet Description

    NO TICE For details about a transformer cabinet provided by the customer, see the instructions provided by the manufacturer. The transformer cabinet converts medium-voltage AC power into low-voltage AC power. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 42 Tap Position Description Input Output Connecting Voltage Voltage Plate Position Position 1 +2 x 2.5% 10 kV 380 V Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 43 Temperature Controller The temperature controller collects the transformer winding temperature signals and controls the fan startup and shutdown. Figure 2-14 Temperature controller (A) Front door closed (B) Front door open Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 44: Cable Inlet And Bus Tie Cabinet (Separate Or Combined)

    FusionPower6000. The bus tie switch (ACB) and ATS in the bus tie cabinet connect to another FusionPower6000 through a dense busway. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 45 (1) Centralized monitoring (2) Cable inlet switches cabinet modules (3) Smart ETH gateways (4) SPDs (5) Input copper bars (6) Output copper bars (7) Cable holes (8) Secondary circuit components Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 46 2500 A/4P E2 800 mm 2500 A/3P E2 2500 A/3P E2 800 mm 2000 A/3P E2 2000 A/4P E2 800 mm 2000 A/3P E2 2000 A/3P E2 800 mm Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 47 (6) SPDs components (7) Smart ETH gateways (8) Input copper bars for bus (9) Input copper bars for cable tie switches inlet switches (10) Output copper bars (11) Cable holes Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 48 (9) Input copper bars for bus tie switches (10) Input copper bars for (11) Cable holes cable inlet switches Indicators, Buttons, and Switches Figure 2-19 Indicators and buttons of a cable inlet switch Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 49 If the indicator is on, the L3 phase input side of indicator the bus tie switch is powered on. On indicator If the indicator is on, the bus tie switch is turned on. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 50: Compensation Cabinet

    ● The SPD switch, SPD, and secondary circuit components shown in the figure are for reference only. The actual products may vary. ● Secondary circuit components include terminal blocks, MCBs, auxiliary contacts, and fuses. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 51 Fault indicator If the indicator is on, the compensation module is faulty. EPO button To power off in emergency, press the EPO button on the compensation cabinet. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 52: Ups

    500 kVA model, and six power modules for the 600 kVA model. ● Switches share one switch handle. Take out the handle when you operate switches and reinstall it after the operations are complete. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 53: Maintenance Bypass Cabinet

    ● The SPD switches, SPDs, and secondary circuit components shown in the figures are for reference only. The actual products may vary. ● Secondary circuit components include terminal blocks, MCBs, auxiliary contacts, and fuses. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 54 1250 A/3P E1 250 A/160 A/100 A/63 A 10 PCS 800 mm Figure 2-25 Separate cabinets (A) 600 mm wide maintenance bypass cabinet (B) 800 mm wide maintenance bypass cabinet Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 55 Figure 2-26 Appearance (layout from left to right) (A) 600 mm wide maintenance (B) 800 mm wide maintenance (C) 1000 mm wide bypass cabinet bypass cabinet maintenance bypass cabinet Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 56 Maintenance Bypass Cabinet Width Switch Specifications Switch Specifications for IT Load for Mechanical Load 4000 A/3P E2 800 A/3P E1 800 mm 3200 A/3P E2 800 A/3P E1 800 mm Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 57 IT load (8) Input copper bars (9) Output copper bars for (10) Output copper bars for IT mechanical load load (11) Cable holes (12) Smart ETH gateways Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 58 Figure 2-30 Indicators and buttons Item Description On indicator If the indicator is on, the corresponding switch is turned on. On button Used to turn on the corresponding switch. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 59 ● When the switch position indication is TEST, the switch is in the test state. ● When the switch position indication is DISCONNECT, the switch is in the overhaul state. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 60: Feeder Cabinet

    (5) Branch monitoring modules (6) Fan modules (7) Single-route 250 A/160 A/100 A/63 A (8) Centralized monitoring modules MCCB output modules (9) Smart ETH gateways (optional) (10) Fire control signal terminals (optional) Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 61: Enclosure Frame

    2.5 Component Description 2.5.1 PAD The PAD can connect to the ECC800-Pro over WLAN and allows you to query the FusionPower6000 status on the FusionModule app. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 62 Front and top views that match the actual layout of the FusionPower6000 can be generated. You can tap a cabinet to view the corresponding real-time data and active alarms. Figure 2-35 Home ● You can view active and historical alarms. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 63 Figure 2-37 Monitor ● You can view performance data, asset details, and logs, and perform software upgrade and system maintenance. Figure 2-38 More Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 64 Monitor View the real-time data and active alarms of a component or cabinet. More Perf Data View performance data. Asset Details View assets and their electronic labels. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 65: Ecc800-Pro

    It is used to manage the FusionPower6000. The PSUs and main control module are hot swappable. ● After a WiFi module is configured, you can connect the device to the PAD and view the device status over the FusionModule app. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 66 RJ45 port are shown in the figure. Figure 2-41 RJ45 port pins There are four GE ports, that is, two WAN ports (WAN1 and WAN2) and two LAN ports (LAN1/PoE and LAN2/PoE). Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 67 Pin 7 Pin 8 Indicator Green Power output indicator indicator ● Steady on: The 12 V DC output is normal. ● Off: No 12 V DC output is provided. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 68 Pin 8 CAN_L Table 2-6 AIDI_1, AIDI_2, and AIDI_3 ports pin definitions Item Description Pin 1 Type_1 sequence Pin 2 Type_2 Pin 3 12 V DC Pin 4 Type_3 Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 69 Pin 7 DO_OUT– Pin 8 Indicator Green Power output indicator indicator ● Steady on: The 12 V DC output is normal. ● Off: No 12 V DC output is provided. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 70 Blinking A network is set up, and at super node access is allowed short (the indicator blinks at 10 intervals Hz, on for 0.05s and then off for 0.05s). Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 71 1s and then off for 1s). Blinking at The PSU application program is short being loaded (the indicator intervals blinks at 4 Hz, on for 0.125s and then off for 0.125s). Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 72: Smart Eth Gateway

    The PSU is normal. 2.5.3 Smart ETH Gateway A smart ETH gateway provides extra ports for 53.5 V DC power supply and FE communication for the ECC800-Pro. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 73 The indicator blinks at super short intervals for 0.5s (blinking at 10 Hz, on for 0.05s and then off for 0.05s) and then turns off for 0.5s. The cycle lasts for Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 74: Centralized Monitoring Module

    If you press the SW button, the ALM indicator blinks intermittently at super short intervals (blinking at super short intervals for 0.5s and then off for 0.5s, lasting 10s in total). Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 75 Hz, on for 1s and then off for 1s). Blinking Communication with the at short host has failed (blinking intervals at 4 Hz, on for 0.125s and then off for 0.125s). Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 76 Power limiting warning due to indicator ambient overtemperature; shutdown alarm for protection against ambient overtemperature or undertemperature Power input overvoltage or undervoltage protection Reverse DC input connection Slight current imbalance Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 77: Branch Monitoring Module

    G: RUN Green Running Blinking The program is running status at long properly (blinking at 0.5 R: ALARM indicator intervals Hz, on for 1s and then off for 1s). Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 78 The input voltage is indicator detected. The input voltage is not detected. OUTPUT Green AC output Steady on The output voltage is indicator detected. The output voltage is not detected. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 79: Technical Specifications

    System Voltage Range 9–11.5 kV Maximum Input 3608 A (matching the full-load current of the 2.5 MVA transformer) Current Frequency 50 Hz/60 Hz Cabling Mode Top cabling, bottom cabling Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 80 Class A environment (indoor space where the temperature and humidity are Environment controlled) IP Rating IP20 Surge Protection Level B surge protection (50 kA, 8/20 µs) Transportation By land and sea Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 81: Cabinets

    = 66 kA ≤ 680 kg 2000 mm x 800 mm x 1000 mm 3200 A/3P E4 = 66 kA ≤ 650 kg 2000 mm x 800 mm x 1000 mm Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 82 = 66 ≤ 650 kg 2000 mm x 800 mm x 1000 2000 A/3P E2 2000 A/3P E2 = 66 ≤ 620 kg 2000 mm x 800 mm x 1000 Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 83: Compensation Cabinet

    For details, see the Power Modules) . Table 3-3 Physical specifications Item Specifications Dimensions (H x W x 2000 mm x 800 mm x 1000 mm Weight < 886 kg Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 84 ● Equalized charging voltage: 2.35 V/cell (lead-acid battery) ● Float charging voltage: 2.25 V/cell NO TICE SmartLi The UPS supports the SmartLi. For details about the parameters, see the User Manual . Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 85: Maintenance Bypass Cabinet

    = 66 ≤ 620 kg 2000 mm x 800 mm x 1000 1600 A/3P E1 1600 A/3P E1 = 66 ≤ 420 kg 2000 mm x 600 mm x 1000 Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 86: Feeder Cabinet

    2500 A ≤ 480 kg 2000 mm x 600 mm x 1000 250 A/160 A/100 A/63 A, 9 2000 A ≤ 410 kg 2000 mm x 600 mm x 1000 Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 87: Enclosure Frame

    ≤ 78 kg 475 mm x 600 mm x 1000 inlet and bus tie cabinet (separate), maintenance bypass cabinet, and feeder cabinet Maximum copper bar weight ≤ 1400 kg Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 88: Installation And Cable Connection

    ● Based on the weight of each cabinet, planned installation positions, and number of cabinets, check that the load bearing capacity of the support surface meets the deployment requirements. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 89 FusionPower6000 3.0 User Manual (Not Against a Wall) 4 Installation and Cable Connection Figure 4-1 Space requirements (space not limited) Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 90: Installation Preparations

    The onsite operation personnel can select tools based on the site requirements. Personal protective equipment Safety helmet Goggles Protective shoes Reflective vest ESD gloves Insulated gloves Protective gloves Safety harness Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 91 Lifting trolley Manual pallet truck Hardware installation tools Flat-head Phillips insulated Insulated torque Hex key insulated torque torque socket wrench screwdriver screwdriver Including (M2.5) (M4/M5/M6) extended sockets (M8/M10/M12/ M16) Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 92 Utility knife Marker Rivet gun Insulated ladder Cable installation tools Cable cutter Wire stripper Diagonal pliers RJ45 crimping tool Electro-hydraulic Cord end terminal Heat gun Scissors pliers crimping tool Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 93 Thermometer Clamp meter Soft measuring Steel measuring Square tape tape Level Laptop Level gauge Multimeter Network tester Phase sequence Dielectric strength Megohmmeter meter tester Machinery Small cutter Cable reel Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 94 Cotton cloth Sandpaper Heat-shrink Insulation tape tubing Other tools Electrician's knife Hacksaw Powder marker Glue gun Brush Paint brush Vacuum cleaner Flashlight Insulation pad SPD extracting Hole saw tool Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 95: Cables

    5 conductor terminal to the cable and secure it using an M12x35 or M16x35 bolt assembly and nut. Prepare the cable, crimping terminal, bolt assembly, and nut by yourself. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 96 PDU. Crimp a tube- alarm signal conductor type pre-insulated cord end cable for the terminal (insertion depth: 8 temperature mm). controller Prepare the cable and terminal by yourself. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 97 (including the PE switch and prepare it by bar) yourself. (2N scenario) Delivered with cabinets. ATS secondary circuit cable Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 98 One DT terminal can be crimped on each of the two sides of the copper bar. That is, two DT terminals can be crimped at one bolt. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 99 ● Transformer cabinet: M8 OT terminal ● Other cabinets: M6 OT terminal Prepare the cable and terminal by yourself. Internal signal Delivered with cabinets. cable of the FusionPower6000 Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 100: Cabinet Transportation, Unpacking, And Checking

    If there is any discrepancy, keep a record and contact the supplier immediately. Step 4 Remove the bolts that secure the cabinet to the pallet and move the cabinet from the pallet. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 101: Installation Process

    FusionPower6000 support surface should be within 2 mm. If the levelness does not meet the requirement, add spacers (thickness: 1 mm) to adjust the levelness. ● Prepare the expansion bolts for securing the cabinets by yourself. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 102 (H) Bottom of the 600 mm wide feeder cabinet and bus tie cabinet (separate) and maintenance bypass cabinet Step 2 Install expansion sleeves for expansion bolts. Drill a hole into the concrete floor using a hammer drill. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 103 UPS. Skip this step if top outlet kits are not configured. Remove the rear door panel from the UPS cabinet. Remove the plastic rivets and PC panels. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 104 2 mm. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 105 Figure 4-8 Leveling a cabinet Step 6 Combine adjacent cabinets. This operation is not required for the transformer cabinet. Figure 4-9 Combining cabinets Step 7 Secure each cabinet to the floor. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 106 UPS or feeder cabinet be used for installing the cabinet on the channel steel. ● Ensure that the surface of channel steel is level. Figure 4-11 Channel steel for the transformer cabinet Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 107: Installing Enclosure Frames

    Figure 4-12 Removing the leftmost and rightmost top connecting kits Step 2 Remove certain parts from the top of the UPS cabinet. Figure 4-13 Removing certain parts from the top of the UPS cabinet Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 108 Combination Copper Bar Screw Details No. and Related Part UPS-1 M16x55, 2 UPS-2 M16x55, 2 M12x35, 2 M8x35, 4 PCS UPS-3 M16x55, 1 M8x35, 4 PCS Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 109 Step 5 Remove the door headers and top panels of the enclosure frames. Put aside the door headers, top panels, and screws. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 110 Figure 4-15 Removing the door headers and top panel Step 6 Replace the beam of the end enclosure frame on the low-voltage side. Figure 4-16 Removing the post and lower beam from the end enclosure frame Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 111 M6X16 Cable inlet and M6X16 3 N·m 8 PCS for a bus tie cabinet, cabinet with a compensation width of 1000 cabinet, and mm or more maintenance bypass cabinet Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 112 Figure 4-19 Installing screws on the copper bars of the positive and negative battery terminals in the UPS cabinet Step 10 Combine adjacent enclosure frames. Figure 4-20 Combining frames ----End Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 113: Installing Copper Bars

    Step 1 Install vertical copper bars for the feeder cabinet. Figure 4-21 Installing vertical copper bars for the IT feeder cabinet Figure 4-22 Installing vertical copper bars for the utility power feeder cabinet Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 114 Related Part M16x60, 3 M16x60, 3 M16x60, 3 M16x60, 3 Step 2 Install the first layer of vertical copper bars for the maintenance bypass and feeder cabinet for mechanical load. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 115 Figure 4-23 Installing the first layer of vertical copper bars for the maintenance bypass and feeder cabinet for mechanical load Combination Copper Bar Screw Details No. and Related Part M8x35, 4 PCS M8x35, 4 PCS M8x35, 4 PCS M8x35, 4 PCS Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 116 (B) Cable inlet and bus tie (C) Compensation cabinet cabinet Combination Copper Bar Screw Details No. and Related Part PE-1 M16x55, 4 PE-2 M12x45, 5 Ground bar M12x45, 4 installed on the top frame Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 117 PE-3 M12x45, 4 Ground bar M8x25, 2 PCS installed on the top frame Figure 4-25 Installing ground bars (2) (A) IT UPS cabinets (B) IT maintenance bypass cabinet Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 118 Ground bar M12x45, 8 installed on the top frame PE-3 M12x45, 6 Ground bar M12x55, 2 installed in the cabinet Ground bar M8x25, 1 PCS installed in the cabinet Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 119 (A) IT feeder cabinets Combination Copper Bar Screw Details No. and Related Part Ground bar M12x50, 4 installed in the cabinet Ground bar M12x45, 4 installed on the top frame Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 120 Combination Copper Bar Screw Details No. and Related Part Ground bar M12x50, 2 installed in the cabinet PE-3 M12x45, 4 PE-3 M12x45, 4 Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 121 (A) Transformer cabinet (B) Cable inlet and bus tie (C) Compensation cabinet cabinet Combination Copper Bar Screw Details No. and Related Part M16x70, 4 M16x70, 4 M16x70, 4 M16x70, 4 Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 122 ● Each time you install a copper bar, tighten the bolts on the copper bar and use a torque wrench to check them based on the standard torque, and mark them. Then install another copper bar. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 123 Combination Copper Bar Screw Details No. and Related Part M12x65, 4 M12x55, 4 M12x65, 12 M12x55, 12 M12x65, 4 M12x55, 2 M12x65, 8 M12x55, 2 M12x65, 8 M12x55, 2 Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 124 Bus clip Bus clip Screw delivered with delivered with the enclosure the bus clip frame Figure 4-30 First-layer horizontal copper bars and bus clips (3) (A) IT feeder cabinets Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 125 (B) UPS cabinet for mechanical (C) Maintenance bypass and cabinet load feeder cabinet for mechanical load Combination Copper Bar Screw Details No. and Related Part M12x65, 6 M12x55, 4 Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 126 ● The rubber pad on the PC partition panel that passes through vertical copper bars is used to cover the gap between the PC partition panel and the vertical copper bars. Figure 4-32 Installing the sheet metal for the UPS cabinet Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 127 4 Installation and Cable Connection Figure 4-33 Installing the sheet metal for the feeder cabinet Figure 4-34 Installing a PC partition panel that passes through the vertical copper bars for the UPS cabinet Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 128 Figure 4-35 Installing a PC partition panel that passes through the vertical copper bars for the feeder cabinet Figure 4-36 Installing vertical PC partition panels for 600 mm and 800 mm wide maintenance bypass cabinets and utility power feeder cabinets. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 129 Figure 4-38 Installing a plastic buckle Figure 4-39 Installing a PC partition panel between the maintenance bypass cabinet and the feeder cabinet Step 6 Install the second layer of vertical copper bars. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 130 Figure 4-40 Installing the second layer of vertical copper bars in the IT maintenance bypass cabinet Combination Copper Bar Screw Details No. and Related Part WP-01 M16x65, 4 WP-02 WP-03 M16x65, 4 WP-04 WP-05 M16x65, 4 WP-06 Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 131 ● When installing the second layer of copper bars, clamp the copper bars upwards into the bus clip slot; otherwise, the bus clip may not be secured. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 132 Combination Copper Bar Screw Details No. and Related Part M12x65, 12 M12x55, 12 M12x65, 8 M12x55, 2 M12x65, 8 M12x55, 2 M12x65, 8 M12x55, 2 M12x65, 8 M12x55, 4 Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 133 Copper Bar Screw Details No. and Related Part M12x65, 8 M12x65, 8 M12x65, 8 Bus clip Bus clip Screw delivered with delivered with the enclosure the bus clip frame Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 134 Step 8 Clean up the foreign matter on the top of the cabinets and remove dust. Step 9 (Optional) Install PC partition panels between the two layers of horizontal copper bars (2). Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 135 Figure 4-46 Installing the remaining PC partition panels for the feeder cabinet Figure 4-47 Installing the remaining PC partition panels for 600 mm and 800 mm wide maintenance bypass cabinets Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 136: Installing Cables

    The cable colors shown in the electrical connection diagrams provided in this section are for reference only. Select cables in accordance with local cable specifications. (Green-and- yellow cables are only used for protective grounding.) Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 137: Cabinet Cable Routes

    (2) Signal cables (3) Ground cable NO TE If installed on channel steel, the transformer cabinet supports top and bottom cabling. Choose either one based on the site requirements. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 138 (excluding feeder switches) (1) Signal cable (2) Ground cable (3) Secondary circuit cable Figure 4-52 Cable routes for the compensation cabinet (1) Ground cable (2) Signal cable Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 139 Figure 4-54 Cable routes for the feeder cabinet and the feeder switches in the maintenance bypass cabinet (A) Front (B) Rear (1) Ground cable (2) Signal cable (3) Power cable Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 140: Cable Routing Requirements

    Step 5 Bind the cable to the nearby beam. Step 6 Clear sundries inside the cabinet. ----End 4.8.3 Installing Ground Cables Step 1 Connect a PE cable to the PE point on the transformer cabinet. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 141: Installing Signal Cables And Secondary Circuit Cables

    Figure 4-57 Connecting an equipotential ground cable ----End 4.8.4 Installing Signal Cables and Secondary Circuit Cables Step 1 Pre-route the UPS parallel cables and place the parallel cable connectors near the PARALLEL ports. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 142 ● For the UPS for mechanical load, connect the BSC cable to this UPS. Step 3 Install dry contact signal cables between the maintenance bypass cabinet and the UPSs. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 143 Connect the power cables to the ECC800-Pro. Secure the ECC800-Pro to the installation position at the bottom of the IT maintenance bypass cabinet. Install the WiFi module. Install the ECC800-Pro ground cable. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 144 ● 3G: WCDMA, covering frequency bands B1, B5, and B8 ● 2G: GSM, covering frequency bands 900 MHz/1800 MHz Loosen the captive screws on the panel of the main control module and remove the module. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 145 Step 6 (Connecting to the management system using a network cable) Use a straight- through cable to connect the WAN1 port on the ECC800-Pro. Step 7 Connect cables to the ECC800-Pro and smart ETH gateway based on the cable labels. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 146 M2.5 0.4–0.6 N·m contact trip signal of the medium-voltage PDU. 5, 6 Travel switch NO Connects to the M2.5 0.4–0.6 N·m contact interlock signal of the medium- voltage PDU. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 147 Step 10 (Fire control linkage scenario) Connect fire control signal cables to the feeder cabinet. Port on the XT Terminal Block Description Screw Torque (Definition) 1 (QF1 24V+), 2 (QF1 GND) Fire control shunt signal M2.5 0.4–0.6 N·m Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 148 QF2 ATS power supply M2.5 0.4–0.6 N·m QF3 XT4-19 QF2 XT4-2 QF2 ATS power supply M2.5 0.4–0.6 N·m QF3 XT4-20 QF2 XT4-3 QF2 ATS power supply M2.5 0.4–0.6 N·m Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 149: Installing Input Power Cables

    QF1 is the cable inlet switch for route A, QF2 is the cable inlet switch for route B, and QF3 is the bus tie switch for route A. ----End 4.8.5 Installing Input Power Cables Step 1 Connect the transformer input power cables. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 150 Step 2 Connect the bus tie dense busway to the input copper bars of the bus switch. Figure 4-67 Connecting the dense busway (A) 3-pole switch (B) 4-pole switch ----End Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 151: Installing Output Power Cables

    4.8.7 Installing UPS Battery Cables Step 1 Remove the top covers based on site requirements. Step 2 Connect the PE, positive, and negative cables for battery strings. Figure 4-69 Connecting battery cables Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 152: Installing Compensation Modules

    Step 2 Set the DIP switches on the compensation modules. Module No. Address Address Address Address Position 1 Position 2 Position 3 Position 4 Step 3 Secure the compensation modules. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 153: Installing Ups Power Modules

    Gently insert the power module; otherwise, the connector may be deformed, which results in poor contact. Step 3 Secure the power module. Step 4 Turn the ready switch of the power module to the locked state. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 154: Installing A Pad

    ● To prolong the PAD battery lifespan and reduce the charge and discharge frequency, turn off the screen when the PAD is not in use. Do not keep it in always-on mode. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 155: Verifying The Installation

    ● All connections are secure. Cabinet doors ● The cabinet doors are secured and in position. ● The doors of adjacent cabinets do not block each other. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 156 ● Cables are routed neatly without twists or crossovers in the cabinets. ● Power cables and signal cables are routed at a safe distance and do not cross each other. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 157 ● The copper bar current transformers (CT) are installed in the correct direction. The side marked P1 faces the cable inlet. ● The cabinet top is clean and free from foreign matter. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 158: Sealing Cabinets

    (2) Transparent film (3) Sealing putty (with the transparent film facing upward) Step 3 Reinstall all protective covers. Step 4 Install the side panel of the end enclosure frame. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 159 Step 6 Attach sealing rubber strips between cabinet top enclosure frames. Figure 4-75 Attaching sealing rubber strips NO TICE Do not remove the dust cover from the UPS before power-on. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 160 Ensure that sealing plates have been installed on the sides of the enclosure frame at the end of the FusionPower6000. Figure 4-77 Installing door headers Step 8 Install bottom sealing plates around the FusionPower6000. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 161 ● Bottom sealing plates need to be installed at the front and rear of cabinets except for the transformer cabinet. Figure 4-78 Installing sealing plates (using the cabinet at an end as an example) ----End Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 162: Power-On Commissioning

    ● Before power-on commissioning, ensure that all check items in the section "Verifying the Installation" are complete. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 163: Performing Insulation And Dielectric Strength Tests

    ● After the insulation and dielectric strength tests are complete, powering on the equipment without restoring the cables and components based on the electrical diagrams and records may damage the equipment, and the losses caused are not covered under warranty. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 164 Disconnect and record all fuses and MCBs on the secondary circuit, and disconnect and record the SPD switch. Record and short-circuit the secondary circuit of the current transformer using a short-circuiting bar. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 165 Remove the cables from the panel of the branch monitoring module for the maintenance bypass switch, and pull out the branch monitoring module. Figure 5-5 Removing the cable and pulling out the branch monitoring module Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 166 150 mm and record them. Mark the corresponding port names on the power cable and voltage sampling cable at the rear panel of the centralized monitoring module, remove the cables, and record them. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 167 ▪ If the test does not involve loads, the preparation is complete. ▪ If the test involves loads, reinstall all MCCB output modules and turn on the switches. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 168 PE bar of the bus tie dense busway. Step 8 Reinstall the removed cables and components and restore the component status based on the electrical diagrams and records ----End Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 169: Powering On The Low-Voltage System

    Pull out the switch handle and place it back on the tray of the front door. Ensure that the triangle arrow on the flange points to ON. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 170: Initial Startup

    Data Center Facility Deployment Guide . details, see the Step 2 Set the language, time and date, network parameters, system parameters, and battery parameters on the Settings Wizard screen. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 171 ● Set Output frequency correctly. Otherwise, loads may be affected and the UPS may not work properly. ● Set all battery parameters correctly based on site requirements. Battery parameter settings are critical to battery maintenance, battery lifespan, and UPS discharge time. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 172 Step 3 After you set parameters on the Settings Wizard screen, the system displays the Bypass mode and No battery alarms, which do not need to be handled. Other alarms need to be handled. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 173: Setting Dry Contact Parameters

    Step 2 Choose System Info. > Settings > Comm. Settings > ModbusTCP Settings and set ModbusTCP encryption to Enable. ----End 5.4.5 Starting the Inverter UPS System User List Default User Preset Password admin (administrator) 000001 Changeme operator (common user) 000001 Changeme Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 174: Powering On Loads

    If there are multiple battery strings, turn on the switch for each battery string and then the general switch between the battery strings and the UPS. The No battery alarm on the MDU disappears. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 175: Commissioning Upss In A Parallel System

    If a single UPS is not powered off after commissioning, verify on the monitoring screen that EPO has been activated successfully. Step 2 Install parallel cables between parallel cabinets. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 176 System Settings: On the LCD, choose System Info > Settings > System Settings. On the WebUI, choose Monitoring > UPS System > Running Parameter > System Settings. Table 5-1 System Settings Item Setting Description Single/Parallel Parallel Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 177 Turn on the battery input switch for each UPS. (If there are multiple battery strings, turn on the switch of each battery string first, and then turn on the general switch between the battery strings and the UPS.) Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 178: Optional) Commissioning The Dual-Bus Ups System

    ● Before commissioning the dual-bus UPS system, ensure that you have commissioned the UPS parallel systems for routes A and B of FusionPower6000. Procedure Step 1 Install BSC cables. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 179: Commissioning The Maintenance Bypass Cabinet

    Step 3 Shut down all UPS inverters. On the UPS LCD, choose Common Functions > Inv. OFF or Common Functions > Parallel Inv. OFF. After the inverters shut down, the UPS enters bypass mode, and the Bypass mode alarm is displayed on the LCD. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 180: Commissioning Feeder Switches

    Supported operating system: Windows 7 and later versions ● It is recommended that the screen resolution be 1366 x 768 or higher. ● Browser: Chrome, Firefox 32, Internet Explorer 11 or later Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 181 Step 4 Set Internet Explorer parameters. When you use Internet Explorer for access, set Internet Explorer to ensure the normal display of and operations on the WebUI. Choose Tools > Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 182 Figure 5-12 Adding an address Enable file download and set the security level of the trusted site to low. Figure 5-13 Setting parameters Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 183 – An account is logged out due to timeout if no operation is performed within 10 minutes after system login. – A maximum of three users can log in to the ECC800-Pro WebUI at the same time. ----End Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 184: Authenticating The Initial Startup Password

    For details, see the Guide . Step 2 Hold down the SW button on the ECC800-Pro for 1s to enable the WiFi function. Figure 5-15 Button position Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 185: Optional) Configuring Cloud Service Access

    FusionPower6000. Step 3 Configure related parameters on the page as instructed. For details, see the function description on the left of the page. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 186 Set this parameter based on the site WAN_1 plan. networking Subnet Set this parameter based on the site parameters mask plan. Default Set this parameter based on the site gateway plan. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 187 In this example, Device Address is FusionPowe Address set to 1. During configuration, set the r6000 Plan actual device address. View. Adding an Device Select ATS from the drop-down list Attribute box. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 188 ● If the compensation modules are from In-Power, select SVG-In- Power. ● If the compensation modules are from Sinexcel, select PDU- Sinexcel-svg100. Connect To Select System-Device name from the drop-down list box. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 189 Plan View Modifying Location Indoor basic Layout Single-row configuratio Half-size Calculate based on the cabinet FusionPower6000 layout. A half-sized qty./row cabinet is 300 mm wide. Round up the value. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 190 Severity to Critical (recommended), Major, Minor, or Warning. Step 8 Choose Monitoring > Power Distribution, click the corresponding transformer, and set relevant parameters on the Running Parameters tab page. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 191: Preparations And App Login

    Before the installation, ensure that the PAD is connected to the Internet and the network is running properly. ● Huawei AppGallery installed on the PAD Log in to the Huawei AppGallery client, search for FusionModule, and tap Install. Huawei AppGallery is preinstalled on Huawei PAD by default. ● Huawei AppGallery not installed on the PAD Issue 03 (2023-02-08) Copyright ©...
  • Page 192 FusionPower6000 3.0 User Manual (Not Against a Wall) 5 Power-On Commissioning Table 5-4 Operation methods for the scenario where Huawei AppGallery is not installed on the PAD Method Procedure Installation Verification Install the app from 1. Log in to Huawei...
  • Page 193 The user name and password for logging in to the app are the same as those for logging in to the ECC800-Pro WebUI. Specify the user name and password, and tap Login. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 194: Setting Management System Parameters

    IP address – WAN_2: Monitor IP > assigned by the 192.168.0.10 WAN_n network administrator. Subnet mask 255.255.255.0 Set this parameter based on the subnet mask assigned by the network administrator. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 195 DC Application > Manager based NetEco > on site NetEco1 requirements. Communication ● Disable: Not Parameters connect to the DC Manager. ● Enable: Connect to the DC Manager. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 196 IP address NOTE of the standby This parameter is management displayed when Enable standby system server. server IP next to Server IP is selected. Port number 31220 31220 Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 197 Therefore, the IP address is displayed as 0.0.0.0, indicating auto adaptation. ● 4G: Connects to the management system through 4G Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 198 ● Disable: Not Parameters connect to the DC Manager. ● Enable: Connect to the DC Manager. NetEco domain dcim.opowercloud Domain name of name .huawei.com the management system Port number 31220 31220 Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 199 Therefore, the IP address is displayed as 0.0.0.0, indicating auto adaptation. ● 4G: Connects to the management system through 4G Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 200 $ (8–32 characters that include at least three of the following types: digits, lowercase letters, uppercase letters, and special characters) Confirm – – authentication password Step 5 Click Submit. ----End Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 201: Ipower Intelligent Management

    5.11 Powering On the System Step 1 Turn on the transformer input switch of the medium-voltage PDU. Step 2 Check the transformer indicators to ensure that the equipment is running properly. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 202 Step 8 Turn on the input switch of the compensation cabinet. Step 9 Power on and start all UPSs. For details, see 5.4 Commissioning a UPS Commissioning UPSs in a Parallel System. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 203 UPS works in inverter mode. Step 10 Turn on the feeder switches one by one and ensure that the voltage of the load power input meets the requirements. ----End Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 204: Faq

    Step 3 Turn off the switches from the feeder switches to transformer switches level by level to power off the equipment based on the electrical diagram of the FusionPower6000. For details about how to power off UPSs, see 6.2 Shutting Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 205: Shutting Down And Powering Off A Ups

    The Bypass mode alarm is displayed on the LCD. Figure 6-1 Normal bypass After you shut down the inverter, the UPS supplies no power if the bypass is abnormal, which causes a power failure for the loads. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 206: Shutting Down And Powering Off Upss In A Parallel System

    UPS inverters to switch the system to bypass mode without powering off loads. ● If you need to power off the entire UPS system, perform all the preceding steps. ----End Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 207: Performing Epo For A Ups

    Step 3 View active alarms and check that the EPO alarm is cleared. If the system bypass input is normal, the UPS transfers to bypass mode. ● On the LCD Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 208: Ecc800 Webui Operations

    Step 1 Choose System Settings > Device Management > Add Device. Step 2 After a device is added, the details about the device connected to the FusionPower6000 are displayed. Figure 6-4 Adding a device Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 209: Adding A Transformer Temperature Controller

    Click Test Connect to check whether the transformer temperature controller is properly connected to the ECC800-Pro. – If the connection succeeds, click Confirm. The connected devices are displayed in the Number of connected devices list. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 210: Adding An Ats

    In this example, Device Address is set to 1. Address During configuration, set the actual device address. Click Test Connect to check whether the ATS is properly connected to the ECC800-Pro. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 211: Adding A Compensation Cabinet

    In the displayed dialog box, select ATS in cabinet and click Finish. Figure 6-5 Changing the mounting relationship ----End 6.6.2.3 Adding a Compensation Cabinet Step 1 Add a compensation cabinet. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 212 Running Parameters tab page. NO TE Ensure that Detail model is correctly set. Otherwise, the FusionPower6000 layout in the app and management system will be affected. ----End Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 213: Setting A Compensation Cabinet Spd Fault Alarm

    Modify Basic Config dialog box is displayed. Set the layout and device quantity in Location, Layout, and Half-size cabinet qty./row based on the actual FusionPower6000 scenario. Figure 6-6 Modifying basic configurations Step 2 Lay out the FusionPower6000 plan view. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 214: Exporting Data

    ECC800-Pro. To ensure that the UPS runs safely, you are advised to arrange an O&M engineer onsite to check the real-time alarms of the UPS during the operation. If any exception occurs, rectify it promptly. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 215: Exporting And Importing A Configuration File

    Step 2 Choose Maintenance > Configuration File. Step 3 Export a configuration file. Specify Configuration file encryption password. NO TE Record the password for importing a configuration file. Click Back Up Current Settings. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 216: Setting The S-Eco Mode For A Ups

    0.5, or the load rate is less than 10%), the UPS automatically transfers to normal mode to avoid supplying power of poor waveforms to loads. The UPS monitors the input voltage waveform in Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 217 Working mode to S-ECO. The information indicating that the UPS works in S- ECO mode is displayed on the LCD. Step 2 Set parameters. Figure 6-8 S-ECO mode parameters 1 Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 218 FusionPower6000 3.0 User Manual (Not Against a Wall) 6 FAQ Figure 6-9 S-ECO mode parameters 2 Figure 6-10 S-ECO mode parameters 3 Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 219 ±8%, ±9%, ±10% bypass voltage and the rated voltage is greater than the specified value, the system determines that the ECO voltage is abnormal and transfers to inverter mode. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 220 If the inverter is not started, the UPS stops supplying power when the bypass is abnormal, and the system may power off. Figure 6-11 S-ECO system status (VFI) Figure 6-12 S-ECO system status (VFD) Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 221: Transferring A Ups To Bypass Mode Manually

    NO TE If you shut down the inverter when the bypass input voltage or frequency exceeds the specified threshold, the UPS supplies no power, and the loads are powered off. Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 222: A Lifting Trolley

    You can decide whether to choose it based on site requirements. Appearance Figure A-1 Lifting trolley (1) Tabletop (2) Handle (3) Lowering switch (4) Elevating pedal (5) Foot brake Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 223 Step 3 Repeatedly step on the elevating pedal to raise the tabletop to a proper height. Step 4 Lift the lowering switch to slowly lower the tabletop to the required height. ----End Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 224: B Acronyms And Abbreviations

    Acronyms and Abbreviations alternating current air circuit breaker active power filter application ASIC application-specific integrated circuit auto transfer switching BCB-BOX battery circuit breaker box Cat 5e Category 5 enhanced direct current Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 225 Ethernet Fast Ethernet Gigabit Ethernet Internet service provider Internet technology liquid crystal display large-scale integration MCCB molded case circuit breaker megawatt negative temperature coefficient Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 226 SNMP Simple Network Management Protocol static transfer switch static var generator telecommunication network voltage uninterruptible power system WiFi Wireless Fidelity WLAN wireless local area network Issue 03 (2023-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.