ESS-240V12-(9AhBPVBA04, 7AhBPVBA04) Battery
Pack
Quick Guide
Figure 4-14 Connecting cables to battery packs for a single UPS2000-G-6 kVA/10
kVA
Connecting Cables to Battery Packs for a UPS2000-G-6 kVA/10 kVA Parallel
System
Figure 4-15 Connecting cables to battery packs for a UPS2000-G-6 kVA/10 kVA
parallel system
Issue 02 (2022-06-30)
NO TE
1. The following wiring diagram uses each standard UPS with one battery pack as an
example.
2. In a UPS2000-G-6 kVA/10 kVA parallel system, each UPS can be configured with one to
four battery packs. The cable connection methods for each UPS and battery pack are
the same as those for a single UPS.