Installation and Operation Manual BEKOKAT
7.2
Decommissioning for service, maintenance or repair
Always proceed as follows to decommission the plant for servicing, maintenance or repairs:
1st
Turn off the BEKOKAT
2nd Open the bypass-line (not included).
3rd
Close the shut-off valves in front of and behind the BEKOKAT
4th
Before starting work, the BEKOKAT
Use the safety valve X4 installed at the compressed air inlet.
5th
De-energize the system via an external disconnecting device.
6th
Let the system cool down.
The cooling can take up to 48 hours.
80 / 88
®
®
master switch.
®
system must be depressurised.
®
.