Unpacking & Machine Installation; Unpacking; Lifting - Sharp 16 Series Manual

High speed precision lathe
Table of Contents

Advertisement

2. UNPACKING & MACHINE INSTALLATION

2-1 Unpacking

When the machine is arrived, first, check if the wooden case is damaged or not,
secondly, open the case and inspect the machine for any damage or short supply of
parts. If so, please contact our company or insurance company immediately in order
to get the best solution or refund; otherwise our company or the insurance company
will not be in the position to compensate for the damage.

2-2 Lifting

Please refer to figure 2-2 for machine unloading from the truck.
The steps of lifting the lathes are:
1. Clamp the bedways with a special made hanger, which consists of clamp and an
iron chain.
2. Raise the lathe a little bit with crane, then check if the lathe is balanced. If not,
move apron and cross slide back or forth to make the machine is balanced.
3. While the machine arrives at the location, put down the machine slowly to avoid
any inaccuracy of the machine caused by bumps or crash.
4. For adjusting the electrical cabinet, the machine should be located allowing
sufficient area, min. over 600mm from wall at back and tailstock end.
Fig.2-2
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

18 series1640l1660l1860l1880l

Table of Contents