Section 1
Introduction
The engineering manual contains instructions on how to engineer the IEDs using the various tools
available within the PCM600 software. The manual provides instructions on how to set up a PCM600
project and insert IEDs to the project structure. The manual also recommends a sequence for the
engineering of protection and control functions, as well as communication engineering for IEC 61850.
The installation manual contains instructions on how to install the IED. The manual provides procedures
for mechanical and electrical installation. The chapters are organized in the chronological order in which
the IED should be installed.
The commissioning manual contains instructions on how to commission the IED. The manual can also be
used by system engineers and maintenance personnel for assistance during the testing phase. The
manual provides procedures for the checking of external circuitry and energizing the IED, parameter
setting and configuration as well as verifying settings by secondary injection. The manual describes the
process of testing an IED in a substation which is not in service. The chapters are organized in the
chronological order in which the IED should be commissioned. The relevant procedures may be followed
also during the service and maintenance activities.
The operation manual contains instructions on how to operate the IED once it has been commissioned.
The manual provides instructions for the monitoring, controlling and setting of the IED. The manual also
describes how to identify disturbances and how to view calculated and measured power grid data to
determine the cause of a fault.
The application manual contains application descriptions and setting guidelines sorted per function. The
manual can be used to find out when and for what purpose a typical protection function can be used. The
manual can also provide assistance for calculating settings.
The technical manual contains operation principle descriptions, and lists function blocks, logic diagrams,
input and output signals, setting parameters and technical data, sorted per function. The manual can be
used as a technical reference during the engineering phase, installation and commissioning phase, and
during normal service.
The communication protocol manual describes the communication protocols supported by the IED. The
manual concentrates on the vendor-specific implementations.
The cyber security deployment guideline describes the process for handling cyber security when
communicating with the IED. Certification, Authorization with role based access control, and product
engineering for cyber security related events are described and sorted by function. The guideline can be
used as a technical reference during the engineering phase, installation and commissioning phase, and
during normal service.
1.3.2

Document revision history

Document
revision
-
A
B
C
Table continues on next page
4
Date
Product version
2017–05
2.2.0
2017–10
2.2.1
2018–03
2.2.1
2018–06
2.2.2
© 2017 - 2023 Hitachi Energy. All rights reserved
History
First release for product version 2.2
Ethernet ports with RJ45 connector added.
Document enhancements and corrections
Technical data updated for PSM. Case dimensions
updated.
Communication protocol manual
1MRK511391-UUS Rev. L
GUID-34B323E4-1319-4D42-80CE-29B0F2D36E2C v8
DNP, 670 series