Installing The Hoop Link, Offset Link, Or Chain Link - Toro 04654 Operator's Manual

8-blade, 11-blade, or 14-blade edgeseries dpa cutting unit traction unit
Hide thumbs Also See for 04654:
Table of Contents

Advertisement

Installing the Hoop Link,
Offset Link, or Chain Link
For cutting units mounting on a traction unit with a
serial number prior to 240000001, obtain and install
the proper lift link as follows:
Note:
The 2 bolts used to mount the lift link are
shipped installed on the cutting unit.
For Greensmaster 3120 and 3150 traction units,
install the hoop link supplied with the traction unit.
Install the hoop link (Part No. 105-5740) to the top
of the cutting unit with 2 bolts. Torque the bolts to
34 to 40 N∙m (25 to 30 ft-lb)
1. Hoop link (Part No. 105-5740)
For the Greensmaster 3250-D traction units, install
the offset link (Part No. 110-2397) supplied with
the traction unit.
Install the offset link
cutting unit with 2 bolts. Torque the bolts to 34 to
40 N∙m (25 to 30 ft-lb).
Important:
Position the lift hook offset toward
the front of the cutting unit.
(Figure
5).
Figure 5
(Figure
6) to the top of the
1. Offset link (Part No. 110-2397)
g020064
6
Figure 6
g020065

Advertisement

Table of Contents
loading

Table of Contents