Transportation; Machine Configuration For Transport - Komatsu PC750LC-7 Operation Manual

Hide thumbs Also See for PC750LC-7:
Table of Contents

Advertisement

TRANSPORTATION

TRANSPORTATION
The machine can be disassembled into the machinery, operator's cab, platform, attachment, and counterweight,
and transported in pieces. Please contact your Komatsu distributor when transporting the machine.

MACHINE CONFIGURATION FOR TRANSPORT

PC750-7 (LOADING SHOVEL)
Undercarriage
Item
Unit
Q'ty
-
A
mm (ft in)
B
mm (ft in)
C
mm (ft in)
Weight
kg (lb)
Work Equipment
Item
Unit
Q'ty
-
A
mm (ft in)
B
mm (ft in)
Overall width
mm (ft in)
Weight
kg (lb)
Upper Structure
Secure the upper structure to the platform with a chain and block.
Item
Unit
Q'ty
-
A
mm (ft in)
B
mm (ft in)
Overall width
mm (ft in)
Weight
kg (lb)
7 - 14
2
1445 (4'9")
5810 (19'1")
1255 (4'1")
21400 (47187)
[10700 X 2 (23594 X 2)]
1
9500 (31'2")
2855 (9'4")
2320 / 2620 (5.1m
[7'7" / 8'7" (6.7 cu.yd)]
18700 / 19100 (5.1 m
[41234 / 42116 (6.7 cu.yd)]
1
2730 (8'11")
5970 (19'7")
3195 (10'6")
24800 (54684)
3
)
3
)
LOADING SHOVEL

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc750-7Pc750se-7Pc800-7Pc800se-7

Table of Contents