Motorola L6Q Installation Manual page 58

Hide thumbs Also See for L6Q:
Table of Contents

Advertisement

Available languages

Available languages

MN010089A01-AD
Chapter 3: Hardware Installation
3. When satisfied with the aiming results, hold the camera in place and use the Hex Key Tool to lock in
the position of the camera.
4. Remove the Mobile Phone Pouch and Mobile Phone.
5. Secure any power cables with the reusable zip ties and trim any carefully excess material from the zip
ties:
If this is a Solar Panel deployment, secure the power cable above the camera.
If this is an AC or DC power deployment, secure the power cable as needed.
58

Advertisement

Table of Contents
loading

Table of Contents