LG BPEL04KAB-E Installation Manual page 19

Expansion battery module
Table of Contents

Advertisement

Available languages

Available languages

K Close the front door and fasten the bolts on the right side. (30 kgf.cm)
L Press the POWER button to turn the battery unit on. And then press and hold the START (5s)
button for 5 seconds. You can hear the sound "click" .
If SOC level is shown on the LED display, the battery operation has been normally succeeded.
M Find the unit Q label on the right side of the battery unit and attach the supplied Q label above
the current label.
a
b
Installation
19

Advertisement

Table of Contents
loading

Table of Contents