Installing The Hp 8110A; Initial Inspection - HP 8110A User Manual

150 mhz pulse generator
Hide thumbs Also See for 8110A:
Table of Contents

Advertisement

Installing
the HP 8110A
Initial
Inspection
Inspect the shipping container for damage. If the
cont,ainer or cushioning material is damaged, keep it until
the cont,ents of the shipment have been checked for
completeness and the instrument has been verified both
mechanically and electrically.
Warning
'Ib avoid hazardous
electric
shock,
do not perform
electrical
tests when there
are signs of shipping
damage
to any part of the instrument's
outer
covers
or panels.
If t,he contents are incomplete, or there is mechanical
damage, or if the inst,rument, does not, pass t,hc
Performance Tests in Chapter 5, notify the near&
Hrwlett-Packard office. Krep the shipping materials for
inspection by the carrier. The HP office will arrange for
repair or replacement wit,hout awaiting settlement,.
lnstslling the HP 8110A 1.1

Advertisement

Table of Contents
loading

Table of Contents