Power-On Commissioning - Huawei PDU8000 User Manual

Dc combiner cabinet
Hide thumbs Also See for PDU8000:
Table of Contents

Advertisement

PDU8000 DC Combiner Cabinet
User Manual
Context
● The power-on commissioning process requires as least two qualified
● Cautions and warnings must be properly placed onsite.
● Powering off the combiner cabinet disconnects the power supply to the
Procedure
Step 1 Perform the insulation check only after the upstream and downstream circuit
breakers of the combiner cabinet are powered off.
1.
2.
3.
Issue 02 (2022-08-10)
5
NO TICE
electricians, one responsible for operations and the other for monitoring.
downstream devices. Exercise caution with this operation when the combiner
cabinet is supplying power to a working system.
Disconnect the SPD fuses FU9 and FU10 in the combiner cabinet, connect the
PSU fuses FU11 and FU12, and turn on all output disconnectors.
Use a multimeter to check that the insulation resistance between the positive
and negative terminals of the SPD, and between the positive and negative
terminals and PE is at least 0.5 megohm.
Figure 5-1 SPD voltage measurement position
After the check is complete, switch off all output disconnectors in the
combiner cabinet.
Copyright © Huawei Digital Power Technologies Co., Ltd.

Power-On Commissioning