Finalizing the installation
Contents of this chapter
This chapter describes how to finalize and check the installation of the PVS-100/120 medium
voltage station (MVS). Obey all local regulations.
WARNING!
Only an authorized electrician is permitted to install the cabling to the MVS. Obey
the
Safety instructions (page
physical injury or death may occur, or cause damage to the equipment.
WARNING!
Do not do electrical installation work during a thunderstorm.
WARNING!
Make sure that all external cable entries are fully sealed to prevent entry of foreign
elements, such as animals and insects.
Finalizing the installation
•
Clean the MVS of all dirt.
•
Repair any damages to the paint surface. See section,
surfaces (page
62).
•
If not yet done, seal the cable entries, cover the cable entries with sand and sprinkle a
handful of cement over the sand. The cement hardens in a few days and it forms a
barrier against small animals and plant growth.
9), and the local safety regulations. If ignored,
Finalizing the installation 49
6
Maintenance of painted