Finalizing The Installation; Contents Of This Chapter - ABB PVS-100 Series Hardware Manual

Solar inverters medium voltage compact skid
Hide thumbs Also See for PVS-100 Series:
Table of Contents

Advertisement

Finalizing the installation

Contents of this chapter

This chapter describes how to finalize and check the installation of the PVS-100/120 medium
voltage compact skid (MVCS). Obey all local regulations.
WARNING!
Only an authorized electrician is permitted to install the cabling to the MVCS. Obey
the
Safety instructions (page
physical injury or death may occur, or cause damage to the equipment.
WARNING!
Do not do electrical installation work during a thunderstorm.
WARNING!
Make sure that all external cable entries are fully sealed to prevent entry of foreign
elements, such as animals and insects.
Finalizing the installation
Clean the MVCS of all dirt.
Repair any damages to the paint surface. See section,
surfaces (page
57).
If not yet done, seal the cable entries, cover the cable entries with sand and sprinkle a
handful of cement over the sand. The cement hardens in a few days and it forms a
barrier against small animals and plant growth.
9), and the local safety regulations. If ignored,
Finalizing the installation 47
7
Maintenance of painted

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents