Transporting; Incoming Inspection At Arrival - ABB PVS-100 Series Hardware Manual

Solar inverters medium voltage compact skid
Hide thumbs Also See for PVS-100 Series:
Table of Contents

Advertisement

Transporting

WARNING!
Keep the transportation height as low as possible. Make sure the total height of
the transportation is not more than the maximum allowed height.
WARNING!
Transport the MVCS on an open heavy-duty chassis. Do not use an enclosed
trailer because the stations surface could easily be damaged.
WARNING!
Do not throw the hooks over the roof. This can damage the paint and cause
corrosion or operation problems.
Obey the following instructions:
Protect the MVCS with wooden corners, plastic film, etc. The MVCS is delivered
unpacked from the factory as standard.
Protect the interior of the MVCS from rainwater by using temporary protection plates
(anti-typhoon) on air intakes and outlets.
The MVCS is built to fit inside an ISO 20 HC (1AAA according to ISO 3874) type shipping
container. It can be transported on a dedicated sea container trailer using the standard
container attachment system.

Incoming inspection at arrival

Visually check for any potential transportation damage(s). If any damages found, mark
and record them and immediately inform your local ABB representative or your ABB
sales contact.
Repair any damaged paint. See section,
Check that the MVCS corresponds to the delivery list and order. Record the deviations
(if any) and immediately inform your local ABB representative or ABB sales contact.
Storing, lifting and transporting 33
Maintenance of painted surfaces (page
57).

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents