Unloading; Tools Used For Unloading - ABB PVS-100 Series Hardware Manual

Solar inverters medium voltage compact skid
Hide thumbs Also See for PVS-100 Series:
Table of Contents

Advertisement

34 Storing, lifting and transporting

Unloading

WARNING!
To prevent damage to the MVCS, keep the delivery packaging and protection
canvas on until you install it.
WARNING!
Inspect the MVCS carefully before performing any activity. Check that there is no
protuberance or any general poor condition.
Before unloading, follow these instructions:
1. Protect the corners of the MVCS against shock.
2. Make sure that the terrain is level and sturdy. Consider that the MVCS has an
approximate weight of 11 tons.
3. Unload the standard container carrying the MVCS inside. Follow local regulations and
applicable standards.
4. Remove all stops, and transportation slings at both ends and laterals.

Tools used for unloading

Five tons forklift
Two guide platforms with length 5 m and width 500 mm
Two belly chains of eight tons
Two slings of eight tons. Minimum five meters.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents