Lifting Instructions - ABB PVS-100 Series Hardware Manual

Solar inverters medium voltage compact skid
Hide thumbs Also See for PVS-100 Series:
Table of Contents

Advertisement

32 Storing, lifting and transporting

Lifting instructions

1. Attach four slings to the fastening points (lifting lungs) located in the roof of the MV
transformer. See the locations marked in below figure.
2. Connect the slings to the crane as shown in below figure.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents