46 Electrical installation
4. Fill the cable trenches and seal the cable entries. For more information, see chapter
Finalizing the installation (page
47).
5. Connect the cables to correct terminals.
Maximum MV cable sizes depend on the connector dimensions. See MV switchgear manual
to determine the maximum cable size and configuration (see
1YVA000024
and 1YVA000026).