Power Cable Connection; Power Supply Cable Connection (Primequest 2400E); Figure 2.12 Details Of External Interface (Pci_Box); Figure 2.13 100V Standard Power Feed Configuration (Single Power Feed, No Redundant Power Feed) - Fujitsu PRIMEQUEST 2000 Series Hardware Installation Manual

Hide thumbs Also See for PRIMEQUEST 2000 Series:
Table of Contents

Advertisement

CHAPTER 2 Connected Information

2.3 Power cable connection

Details of external interface (PCI_Box)
2.3
Power cable connection
Input power system of PRIMEQUEST 2000series and PCI_Box is described in this section.

2.3.1 Power Supply Cable Connection (PRIMEQUEST 2400E)

Input power system diagram of PRIMEQUEST 2400E is as shown below.
100 V Standard Power Feed Configuration (Single power feed, no Redundant Power
Feed)
It is necessary to arrange three PSUs, three FANUs and three power supply cables (100 V NEMA 5-15P) for
100V standard power feed configuration (single power feed, no redundant power feed).

FIGURE 2.13 100V Standard Power Feed Configuration (Single power feed, no Redundant Power Feed)

Number
(1)

FIGURE 2.12 Details of external interface (PCI_Box)

Distribution Panel AC100V AC#0system
Download from Www.Somanuals.com. All Manuals Search And Download.
Description
22
PCIC:PCI slot
LNKC:LINK card
C122-H007-01EN

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primequest 2400ePrimequest 2800ePrimequest 2800b

Table of Contents