Site Planning Overview

Choosing the Server Location

You need to be aware of the following requirements whether you are providing computer-
room space or other properly prepared space for your server:
Locate the server away from high-traffic areas and potential impacts. High-traffic
!
areas include patch panels, experimental equipment, or equipment that needs
frequent physical reconfiguration.
Choose a location where the server will be free from significant temperature or
!
humidity changes, or possible damage from moisture.
Locate the server in a clean environment, free from smoke and dust.
!
Verify that the location you select has a sturdy, level floor, and is not subject to
!
vibration. The rack holding the server must be stable during normal operation
and service.
Make sure the server has adequate space in front of and behind the rack for times
!
when service or reconfiguration is necessary. If the rack has a door, it must be
able to open completely to allow access to the front and rear panels of the server.
Make sure there is adequate power and the correct receptacle type for each server
!
component, the rack power strips, and the UPSs. Do not use extension cords to
plug in any of the server components.

Customer Responsibilities

You are responsible for scheduling, planning, and preparing a suitable environment for the
installation and operation of the Express5800/1000 Series server.
The server models described in this guide are primarily designed to be installed and
operated in a computer room (controlled) environment. If large scale servers are new to
your site, you will need to pay particular attention to the following items:
Local building codes
!
Local electrical codes
!
Local safety codes
!
Space and weight limitations and server accessibility
!
Environmental requirements (temperature, humidity, etc.)
!
Electrical and grounding requirements.
!
4 Express5800/1080Xd/1160Xd/1320Xd Site Preparation Guide