Welcome To Site Planning For Express5800/320Ma 3.2 Ghz, 3.6 Ghz, And Dual-Core Systems; Site Planning Overview - NEC Express5800/320Ma Planning Manual

Hide thumbs Also See for Express5800/320Ma:
Table of Contents

Advertisement

For an overview of the information you need to know and of the tasks you need to
perform to prepare a site for an Express5800/320Ma 3.2 GHz, 3.6 GHz, or Dual-Core
system, see:
"Site Planning Overview" on page 1-1
"Site Planning for Fault-Tolerant Systems" on page 1-2
"Site Planning Checklist" on page 1-3
"System Documentation" on page 1-5

Site Planning Overview

Site planning for fault-tolerant systems
Space planning
Provide adequate space for the system or cabinet and for a desk or table to
accommodate components outside a cabinet. Also provide enough space for
servicing the systems and components.
Purchasing an appropriate cabinet and monitor
If you do not purchase a monitor from NEC Solutions (America), Inc., provide a
monitor that meets the system's requirements.
If you do not purchase the cabinet that NEC Solutions (America), Inc. references,
provide a cabinet that meets the system's requirements.
Electrical (AC) power planning
Provide electrical power sources that meet the system's requirements, optionally
including the purchase of a qualified
Network and telephone line planning
Provide sufficient network and analog telephone lines.

Welcome to Site Planning for Express5800/320Ma 3.2 GHz, 3.6 GHz, and Dual-Core systems

Welcome to Site Planning for
Express5800/320Ma 3.2 GHz, 3.6 GHz,
includes:
and Dual-Core systems
uninterruptible power supply
Chapter 1
1-
(UPS).
1-1

Advertisement

Table of Contents
loading

Table of Contents