Installing The Power Trim And Tilt Unit; Bleeding The Power Trim And Tilt Unit (Built-In) - Yamaha F90D Service Manual

Outboard motor f90d
Hide thumbs Also See for F90D:
Table of Contents

Advertisement

NOTE:
• Repeat this procedure so that the ram goes
up and down four or five times (be sure to
wait a few seconds before switching the
leads).
• If the ram does not move up and down eas-
ily, push and pull on the ram to assist oper-
ation.
8. Check the fluid level when the tilt ram is
fully extended. Add sufficient fluid if nec-
essary.

Installing the power trim and tilt unit

1. Fully tilt the outboard motor up, and then
support it with the tilt stop lever 1.
CAUTION:
After tilting the outboard motor up, be
sure to support it with the tilt stop lever.
2. Install the collars and bushings.
3. Lift the power trim and tilt unit up, and
then install the upper mounting shaft 2.
4. Install the circlip 3.
5. Install the lower mounting shaft 4, and
then install the circlips 5.
6. Route the PTT motor leads through the
hole, and then install the holders and
plastic ties.
7. Connect the ground lead 6.
6D81G11
Bleeding the power trim and tilt unit
(built-in)
1. Fully turn the manual valve counterclock-
1
S60C7975
2. Fully tilt the outboard motor up, and then
3. Tighten the manual valve by turning it
4. Let the fluid settle for 5 minutes.
5. Push and hold the power trim and tilt
Tilt cylinder and trim cylinder
2
3
A A
5
5 4
A A
wise.
release it to let it lower by its own weight
four to five times.
clockwise.
Reservoir cap:
7 N·m (0.7 kgf·m, 5.2 ft·lb)
switch in the up position to check that the
outboard motor is fully tilted up.
A A
A A
1
6
2
3
A A
S6D87470
4
5
6
S60C7745
7
8
9
7-44

Advertisement

Table of Contents
loading

This manual is also suitable for:

F90tr

Table of Contents