Secure The Appliance; Water Piping; Inlet - Outlet Connections - Bosch Compress 3000 DW FO Installation Instructions Manual

Electric heat pump water heater
Hide thumbs Also See for Compress 3000 DW FO:
Table of Contents

Advertisement

16 | Installation instructions
In New Zealand, the installation must comply with Clause G12
of the New Zealand Building Code.
All packaging materials must be removed from the water heater
prior to its installation.
Required clearances
There must be a 60 cm vertical clearance, a 100 cm minimum
clearance in front of the inlet/outlet grilles and 20 cm clearance
from the back of the appliance (where the drain is) to any
object ( Fig. 7). This will ensure a proper air flow through the
appliance mode and facilitate the service any time is needed.
Appliance orientation
In case of possible direct exposure to strong wind:
▶ Face the air outlet to the most protected area.
The direct incidence of strong wind in the outlet grille during
long periods may affect the performance of the heat pump
increasing the heating times. The use of the silent mode is not
recommended in case of moderate or strong wind.
Condensation drain
The unit has a condensate drain, therefore a drain must be
available in close proximity to the unit. The drain must be no
higher than 90 cm above the ground. Discharge point must
comply with AS/NZS 3500.4.
If no drain is available, then a common condensate pump with
a capacity no less than 4 liters/day must be purchased from a
local builder and supply store and installed.
4.3

Secure the appliance

▶ Remove the shrink wrap and external protective packaging.
▶ Lift the appliance from its pallet following the instruction in
the packaging.
▶ To correctly align the appliance at the installation location,
adjust the height of the adjustable feet.
To ensure faultless operation, the unit must
be installed vertically, with a tilt no more than
1°.
WARNING: Damage to external tank casing!
▶ Do not tilt more than 20° without
packaging.
6 720 801 244 (2013/08)
4.4

Water piping

WARNING:
All plumbing work must be carried out by a
qualified professional and in accordance
with the Plumbing Standard AS/NZS
3500.4 and local authority requirements.

4.4.1 Inlet - Outlet connections

Installation of the water inlet or outlet pipes: The water inlet and
outlet thread are ¾ BSP (internal thread). Pipes must be heat-
resistant, durable, and UV resistant (when doing outdoor
installation).
Installation of the pipe for PTR valve: The spec of the valve
connecting thread is ½ BSP (internal thread).
WARNING:
Care should be taken not to touch the pipe
work as it may be hot.
All pipe work should be insulated with proper insulating
material (weatherproof and UV resistant if exposed) to
optimize energy efficiency. Water piping sizing should be
performed in accordance with AS/NZS 3500.4.
CAUTION:
The temperature and pressure-relive valve
must be installed according to local code.
Not doing so will cause damage to the
appliance and damage to other property.
P&T Valve
Barrel-drain
Fig. 9
Typical installation
Water outlet
Notice:
the mixer tap is required
on the hot water usage
terminal
One way valve
Tap water
Water inlet
Y-shaped filter
Thermal expansion tank
(if required)
6720801244-09.1V
Compress 3000 DW FO

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Compress 3000 dw fo hp 270-1e 0 fov/s

Table of Contents