Cst Heater Kit-J1 Installation Procedure
Checking the Contents
[1]
[2]
[4]
[5]
[6]
Unpack the shipping carton and confirm the following components are contained in the carton.
[1]
Heater PCB
[2]
Heater SW harness
[3]
Heater AC harness
[4]
Heater DC harness
[5]*1
High temperature caution label
[6]*1
Cassette heater sheet
[7]
Screw (RS-tight, M3x8)
*1:These items are used only when the cassette heater is to be installed in the iR2530/2525/2520
series model with its 1st cassette capacity is 250 sheets. Save them even if the cassette heater is
not being installed.
9
Installation > Cst Heater Kit-J1 Installation Procedure > Points to Note Before Installation > Turning Main Power OFF
[3]
[7]
F-9-91
F-9-91
1pc.
1pc.
1pc.
1pc.
1pc.
1pc.
1pc.
9
Installation > Cst Heater Kit-J1 Installation Procedure > Points to Note Before Installation > Turning Main Power OFF
Points to Note Before Installation
Turning Main Power OFF
CAUTION
Perform the following in the order prior to the installation.
1) Turn the main power of the host machine OFF.
2) Confirm the control panel display and the main power lamp have turned OFF
and unplug the power cord.
9-44
9-44