Motorola PTP 600 Series Deployment Manual
Hide thumbs Also See for PTP 600 Series:

Advertisement

Quick Links

PTP 600 Series
Deployment Guide
Contents
Protect Your Installation .............................................................................................................................. 2
Checklist, Site Survey and Tools................................................................................................................. 4
Bench Testing (Optional)............................................................................................................................. 5
Mast, Tower or Building Installation ............................................................................................................ 8
Installation Wiring ...................................................................................................................................... 11
Cable Preparation and Installation ............................................................................................................ 12
Testing and Fault Finding (Troubleshooting)............................................................................................. 15
User Information to be Recorded .............................................................................................................. 18
Installation and Commissioning................................................................................................................. 19
Registration Warranty and Ordering Information....................................................................................... 22
1
4Gon www.4Gon.co.uk info@4gon.co.uk Tel: +44 (0)1245 808195 Fax: +44 (0)1245 808299

Advertisement

Table of Contents
loading

Summary of Contents for Motorola PTP 600 Series

  • Page 1: Table Of Contents

    PTP 600 Series Deployment Guide Contents Protect Your Installation ..........................2 Checklist, Site Survey and Tools......................... 4 Bench Testing (Optional)..........................5 Mast, Tower or Building Installation ......................8 Installation Wiring ............................11 Cable Preparation and Installation ......................12 Testing and Fault Finding (Troubleshooting)..................... 15 User Information to be Recorded ......................
  • Page 2: Protect Your Installation

    The recommended standard components for protecting installations are: • Screened CAT 5e cable also known as Shielded CAT 5e or CAT 5e STP (Shielded Twisted Pair) • Surge Arrestor: type PTP-LPU: 4 or 8 per link (2 or 4 Motorola Kits Part Number WB2907AA) • Grounding Stake •...
  • Page 3 • Surge arrestors of type PTP-LPU must be installed at both the ODU and building entry • There must be an earth connection at building entry More information: PTP 600 Series User Guide Section: “Lightning Protection” Additional Grounding Requirements for Connectorized ODU Antenna cables should be grounded within 0.3 metres (1 foot) of the ODU...
  • Page 4: Checklist, Site Survey And Tools

    This information is important if you are to achieve an accurate link feasibility assessment. The PTP 600 Series are designed to operate in Non-Line-of-Sight (NLoS) and Line-of-Sight (LoS) environments. Link planning enables a link of known quality to be installed. This involves the acquisition of path profile data (using Motorola’s free LINKPlanner utility).
  • Page 5: Bench Testing (Optional)

    Bench Testing (Optional) It is advised that the link be configured and tested on a bench before the final installation of the units on a pole or a mast. The following steps give details of how to connect an ODU to a PC in order to check the configuration details, change the IP settings or modify the license key.
  • Page 6 CAUTION: Do not dress the RJ45 cables too tightly, as this may make the connections unreliable. More information: PTP 600 Series User Guide Section: “Connecting Up” Configuration Checks Step 1: Use a web browser to connect to IP address http://169.254.1.1 for Slave and http://169.254.1.2 for Master units.
  • Page 7 Repeat the Power Checks and Configuration Checks for the paired unit and check that the status of the link shows UP on the ‘Status Page’. More information: PTP 600 Series User Guide Section: “System Administration Pages” 4Gon www.4Gon.co.uk info@4gon.co.uk Tel: +44 (0)1245 808195 Fax: +44 (0)1245 808299...
  • Page 8: Mast, Tower Or Building Installation

    WARNING: If the safety loop or its fixing is damaged in any way or has been exposed to a shock loading due to a fall, replace it with a new one before undertaking any further operations. More information: PTP 600 Series User Guide Section: “Mounting the ODUs” 4Gon www.4Gon.co.uk info@4gon.co.uk Tel: +44 (0)1245 808195 Fax: +44 (0)1245 808299...
  • Page 9 75mm (3”). The ODU mounting bracket is designed to work only with poles with diameter in the 50 mm (2”) to 75 mm (3”) range. • Do not over-tighten the bolts. More information: PTP 600 Series User Guide Section: “Mounting the ODUs” 4Gon www.4Gon.co.uk info@4gon.co.uk Tel: +44 (0)1245 808195 Fax: +44 (0)1245 808299...
  • Page 10 PIDU voltage exceeds the limit allowed in some countries for safe handling in wet conditions and therefore may create a safety hazard. More information: PTP 600 Series User Guide Section: “Mounting the ODUs” 4Gon www.4Gon.co.uk info@4gon.co.uk Tel: +44 (0)1245 808195 Fax: +44 (0)1245 808299...
  • Page 11: Installation Wiring

    Installation Wiring Motorola PTP 600 Series Installation Wiring All upper tower grounds should be PTP 58600 ODU within 0.3 metres of the +55V and LED/Reset ODU bracket and on Signalling the same metal Ethernet Ethernet Ethernet Ethernet Chassis RJ45 Cable to LPU & ODU...
  • Page 12: Cable Preparation And Installation

    The maximum cable length between the ODU and the user’s Network Equipment is 100m (330 ft). Cable lengths up to 300m (984 ft) can be used where the PIDU Plus to ODU cable is supplying power only, that is, when using the PTP 600 Series Bridge Optical Interface Correct Cable Preparation for the Recommended Cable CAUTION: Check that the crimp tool matches the RJ45 connector being used.
  • Page 13 Cable Preparation and Installation Cable and Gland Installation To install the cables and glands, follow these steps: Step 1: Make a cable as specified in “Cable Step 2: Support the drop cable and gently hand Preparation”. Plug in the RJ 45 into the ODU. screw the gland body into the ODU until the O ring seal is flush to the ODU body.
  • Page 14 Cable Preparation and Installation Apply small movements to the cable until you see a gap here before unscrewing the gland body. More information: PTP 600 Series User Guide Section: “Connecting Up” 4Gon www.4Gon.co.uk info@4gon.co.uk Tel: +44 (0)1245 808195 Fax: +44 (0)1245 808299...
  • Page 15: Testing And Fault Finding (Troubleshooting)

    Testing and Fault Finding (Troubleshooting) Perform troubleshooting (fault finding) procedures either on a newly installed link, or on an operational link if communication is lost. When the link end hardware (PIDU, LPU, ODU and cabling) has been installed, start it by following this procedure: Step 1: Connect the RJ45 from the ODU (or LPU if fitted) to the PIDU and apply mains or battery power to the PIDU.
  • Page 16 If a GPS Synchronization Box has been installed, but one or more of its status LEDs are not illuminated, refer to “Test GPS Synchronization Box” in the User Guide. More information: PTP 600 Series User Guide Section: “Troubleshooting (Fault Finding)”...
  • Page 17 17.7 16.3 16.9 19.6 18.0 18.6 29.0 26.5 27.1 38.4 35.0 35.6 47.7 43.5 44.1 57.1 52.0 52.6 More information: PTP 600 Series User Guide Section: “Troubleshooting (Fault Finding)” 4Gon www.4Gon.co.uk info@4gon.co.uk Tel: +44 (0)1245 808195 Fax: +44 (0)1245 808299...
  • Page 18: User Information To Be Recorded

    User Information to be Recorded to record the specified information. This information will be useful if there Table 2 Table 3 is a need to contact Motorola support or to identify future changes in the installation. Table 2 – Resistance Values Measure Measured...
  • Page 19: Installation And Commissioning

    Installation and Commissioning Aligning the PTP 600 Series Bridge ODUs The PTP 600 Series Bridge uses audible tones during installation to assist the installer with alignment. The installer should adjust the alignment of the ODU in both azimuth and elevation until highest pitch tone is achieved The pitch of the alignment tone is proportional to the received power of the wireless signals.
  • Page 20 • Slave unit: The Slave unit does not have a ranging process. The slave unit will change to the Synchronized state as soon as the wanted signal is demodulated. More information: PTP 600 Series User Guide Section: “Establishing a Radio Link”...
  • Page 21 Installation and Commissioning Adjust Power Settings The transmit power levels of the installed units must be adjusted to ensure they are not too high. Excessive power levels may cause saturation of the receivers or false radar detection (in radar enabled regions), leading to degradation of link performance and link failure. To adjust power levels, follow this procedure: Step 1: Consult the report generated by the LINKPlanner tool and note the Transmit power recommended levels.
  • Page 22: Registration Warranty And Ordering Information

    Registration Warranty and Ordering Information The PTP600 is an extraordinarily robust radio communications link with unsurpassed availability and reliability. Along with your Motorola PTP Bridge you get a 12-month Standard Warranty that provides a 30-day repair-and-replacement program for hardware defect failures and minor software enhancements as they become available.
  • Page 23 4Gon www.4Gon.co.uk info@4gon.co.uk Tel: +44 (0)1245 808195 Fax: +44 (0)1245 808299...

Table of Contents