Siemens Liquid-cooled Generators Installation Manuallines page 15

Table of Contents

Advertisement

BATTERY INSTALLATION
Before connecting the battery, make
certain that normal utility voltage at the
transfer switch is correct and the system is
ready to be put into operation.
Check the engine oil, the coolant level,
belt tension, and if so equipped, the
gearbox oil.
Check the battery to make sure it is fully
charged before installing.
Follow all safety procedures detailed in
the Owner's Manual and observe polarity
when connecting the battery. Make sure
all terminal connections are tight.
Connect the power leads for the battery
charger to the 120-Volt, 15 or 20-Amp
circuit as shown in the Installation
Manual.
1

Advertisement

Table of Contents
loading

Table of Contents