Place the transfer switch in AUTO and
open the main breaker. The generator
should start and after the appropriate time
delay, the transfer switch should transfer
power to the generator without any loads.
Close the individual breakers in the
distribution panel one at a time until the
generator has accepted the entire load.
Then close the main utility breaker to
restore normal utility power.
After the engine has completed its cool-
down cycle and has shut off, open the
main breaker and allow the generator to
accept the entire load immediately. Verify
gas pressure at the secondary regulator
while the unit is under full load.
After shutting off the generator and
restoring utility power, you'll need to set
the current time and date and schedule
the automatic exercise function in the
generator control panel.