Auto Tap Test; Auto Seek Test; Auto Seek And Auto Tap Test; Head Unload Delay - NEC FD1165 Maintenance Manual

Flexible disk drive
Hide thumbs Also See for FD1165:
Table of Contents

Advertisement

5.1.1
Auto Tap Test
The
auto
tap
test
consists
of
a
head
load/head
unload
action.
To initiate the auto tap test,
use the following
procedure.
a.
Turn off the power to the disk drive.
b.
Connect diagnostic pin T2 to the center pin.
c.
Select head load jumper position HL2 and connect HL2
to ground.
d.
Turn on the power
to the disk drive to start the
auto tap test.
5~1.2
Auto Seek Test
The auto seek test consists of a continuous track seek, from
tr ack 0 to tr ack 76, with the
read/wr i te heads
unloaded.
Select the auto seek test as follows.
a.
Turn off the power to the disk drive.
b.
Connect diagnostic pin T3 to the center pin.
c.
Turn on the power
to the disk drive to start the
auto seek test.
5.1.3
Auto Seek and Auto Tap Test
The auto seek and auto tap test performs the auto seek and
auto tap functions simultaneously.
Select the auto seek and
auto tap test as follows.
a.
Turn off the power to the disk drive.
b.
Connect diagnostic pins T2 and T3 to the center pin.
c.
Select head load jumper position HL2 and connect HL2
to ground.
d.
Turn on the power
to the disk drive to start the
auto seek and auto tap test.
5.2
HEAD UNLOAD DELAY
To delay the head unload action by 250 ms, short pin Tl (see
Figure 5-1)
to ground.
With Tl shorted
to ground,
rapid
head
load/unload actions
(less
than
250 ms
apart)
cannot
occur.
Normally this pin is open.
5-2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents