HOW TO OPERATE
Checking/Setting Master Schedule
Fig. 28-1 Copy to Operating Schedule Screen
A
Fig. 28-2 Confirmation Message Screen
46
EN-
B
(continued)
(continued)
28
Copy to Operating Schedule
An operating schedule is updated to the contents of
the current master schedule.
A Push [Copy to Operating Schedule].
The Confirmation Message screen (Fig. 28-2)
appears.
B Push [Yes] to update an operating schedule.
Push [No] to return to the Copy to Operating
Schedule Screen (Fig. 28-1) without updating an
operating schedule.