Installer: Test Run - Toshiba RAV-CT100-M Installation And Owner's Manual

Dx air curtain
Table of Contents

Advertisement

DX Air Curtain
6
TEST RUN
Before test run
• Before turning on the power supply, carry out the
following procedure.
1) Using 500V-Megger, check that the resistance
of 1MΩ or more exists between the terminal
block of the power supply and the earth
(grounding).
If resistance of less than 1MΩ is detected, do
not run the unit.
2) Check the valve of the outdoor unit being
opened fully.
• To protect the compressor at activation time,
leave power-ON for 12 hours or more before
operating.
How to execute a test run
Using the remote controller, operate the unit as
usual.
A forced test run can be executed in the following
procedure even if the operation stops by thermo-
OFF.
In order to prevent a serial operation, the forced test
run is released after 60 minutes have passed and
returns to the usual operation.
• Do not use the forced test run for cases other
than the test run because it applies excessive
load to the devices.
CAUTION
In case of wired remote controller.
Procedure 1
Keep
button pushed for 4 seconds or more.
[TEST] is displayed on the display part and the
selection of mode in the test mode is permitted.
Procedure 2
Push
button.
Procedure 3
Using
button, select the operation mode,
[
HEAT].
• Do not run the air conditioner in a mode other
than [
HEAT].
• The temperature controlling function does not
work during test run.
• The detection of errors is performed as usual.
Procedure 4
After the test run, push
test run.
(Display part is same as procedure 1).
Procedure 5
Push
check button to cancel (release from) the
test run mode.
([TEST] disappears on the display and the status
returns to normal).
15
Installer
button to stop a

Advertisement

Table of Contents
loading

Table of Contents