Issue 1.2
1.2
3 - 16
1.1.6
Install AC Power Cords on Multiple 19" Chassis (Optional)
To install the AC power cords, locate the supplied AC power cords and
attach to the AC Inlets located on the back of the Controlling and Expansion
Chassis.
Figure 3-25 Install 19" AC Power Cords (Multiple-Chassis)
1.1.7
Install Additional Blades 19" Chassis
Refer to Chapter 4,
1.1.8
Apply Power to the 19" Chassis
Refer to Chapter 4,
Installing the 9.5" Base (CHS2UG) Chassis
The CHS2UG chassis have three universal blade slots for station, trunk and
optional blades.
Before proceeding with installation of chassis, ensure site preparation is
completed. The Gateway (CHS2U GW) chassis can be:
Wall-mounted – refer to
m
Stand-mounted – refer to
m
page
3-46.
The Base (CHS2UG) chassis can be:
Wall-mounted – refer to
m
2.1 Installation and Safety Precautions on page
2.6 Powering Up the SV9100 on page
2.2 Wall Mounting the 9.5" Chassis on page
4.2 Stand Mounting the 9.5" CHS2UG B Chassis on
2.2 Wall Mounting the 9.5" Chassis on page
UNIVERGE SV9100
AC Power
Cords to
AC Inlets
4-9.
3-25.
3-25.
Installing the SV9100 Chassis
4-3.