Figure 2 Airflow through other 10500 switch chassis
(1) Power supply air intake vents
(3) Chassis air intake vents
Space
For easy maintenance, follow these guidelines:
A minimum of 10 cm (3.94 in) of clearance is reserved between the rack and walls or other devices.
•
The equipment room is a minimum of 3 m (9.84 ft) high.
•
•
Rack dimensions are sufficient for the chassis. For more information about chassis specifications,
see
"Appendix A Chassis views and technical
Tools and equipment
Table 6
lists the tools and equipment that you might use during installation, and all of them are user
supplied.
Table 6 Tools and equipment list
Category
Measuring and marking tools
Drills
Fastening tools
Small tools
(2) Power supply air exhaust vents
(4) Chassis air exhaust vents
specifications."
Tool
Long tape, ruler (of 1 meter, or 3.28 ft), gradienter, marker, chalk line, and
pencil
Percussion drill, electric drill, and several auxiliary drill bits
Flat-blade screwdriver P4-75 mm
Phillips screwdriver P1-100 mm, P2-150 mm, and P3-250 mm
Socket wrench M5
Socket wrench M6
Needle-nose pliers, diagonal pliers, combination pliers, wire-stripping pliers,
crimping pliers, RJ-45 crimping pliers, file, and handsaw
6