Step
16
Put the process unit back into the
machine, and remove the grips.
17
Install the two screws removed in step
12.
18
Install the photosensitive drum
positioning knob.
19
Install the primary charging assembly.
(Be sure to put each charging assembly
back to its original location.)
20
Slide out the transfer unit, and remove
the drum protection sheet in the
direction of the arrow.
Be sure to pull straight down
the drum protection sheet.
Puling it the front can tear it.
Store away the drum protection sheet.
Points to Note about the
Drum Protection Sheet
• Do not touch its areas that
• To store, put it in a plastic
• If it must be rolled, be
21
Install the transfer unit cover, and put
the transfer unit back into position; then,
set (lock) the lever of the transfer unit.
22
Release the lock to the lower left of the
hopper; then, bring down the hopper
assembly to the bottom to set it in
position.
23
Insert the cover switch actuator into the
cover switch assembly.
24
Check the power supply, and connect
the power plug. Turn on the power
switch, insert the control key, and turn
it.
25
Start service mode, and press
FUNC
.
COPYRIGHT © 2001 CANON INC.
Work
will come into contact with
the drum.
bag, and keep it protected
from dust and oil.
sure that the side that will
come into contact with the
drum is inside.
CLC1000/1000S/3100 REV.2 MAY 2001 PRINTED IN JAPAN (IMPRIME AU JAPON)
5. INSTALLATION
Remarks
Drum protection sheet
Drum protection sheet
5-11