Installing The Extended Battery Module (Ebm) - Lenovo RT1.5kVA Installation And User Manual

2u rack or tower ups
Hide thumbs Also See for RT1.5kVA:
Table of Contents

Advertisement

Note: The UPS charges the battery packs as soon as it is connected to the
AC-power source, even if the
Procedure
1. Connect the UPS input socket
2. Connect the loads to the UPS using the cables
3. Fit the connection securing system
What to do next
After the UPS is connected to the AC power source, eight hours of charging is
required before the battery packs can supply the rated backup time.

Installing the Extended Battery Module (EBM)

24
Installation and User's Guide
the protected equipment. Connect a 250 V - 16 A cable to the socket
the AC-power source.
the priority loads to the four outlets marked (9) and the non-priority loads to
the four outlets marked
For the 2AX, 2KX, 3AX, and 3KX models, connect any high-power devices to
the 16 A outlet
.
To program shutdown of outlets
optimize the available backup time, check the in/out settings (described in
Table 1 on page 13).
pulled out accidentally.
Machine Types and Models
5594-2BX
5594-3BX
button is not pressed.
to the AC-power source using the cable of
that can be programmed in pairs (1 and 2).
during operation on battery power to
that prevents the plugs from being
Weights (kg/lb)
72.30 / 32.80
102.3 / 46.39
, then to
. It is preferable to connect
Dimensions (mm/inch) D x
W x H
20.6 x 17.4 x 3.4 / 522 x 441.2
x 86.2
25.5 x 17.4 x 3.4 / 647 x 441.2
x 86.2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rt3.0kvaRt2.2kva

Table of Contents