Rack installation

About this task
The UPS and connected EBMs must be installed no higher than 5 feet (1.5m) above
the floor to allow for easy installation and servicing.
Procedure
For mounting on rails, follow steps 1 to 4 in the illustration.
Note: The rails and necessary hardware are supplied by Lenovo.
1. Remove the two bezel sections.
Connect the battery
2.
module (never pull on the
wires).
3.
Attach the left-hand side
of the front panel by sliding it,
then by locking the push
button.
4.
Attach the center panel by
inserting the tabs on the left
side into the slots and rotating
it closed.