Mechanical Mounting; Connecting The Ebm(S); Rack Installation; Preparing The Ebm For Rack Mounting - Lenovo RT8.0kVA Installation And User Manual

6u rack or tower ups
Hide thumbs Also See for RT8.0kVA:
Table of Contents

Advertisement

Mechanical mounting

For rack installations, mount the MBP to the rail behind an EBM, just below the
UPS. For tower installations, mount the MBP to an EBM.

Connecting the EBM(s)

About this task
Note: A small amount of arcing might occur when connecting EBMs. This is
normal and will not harm personnel. Insert the EBM cable into the battery
connector quickly and firmly.
Procedure
1. Plug the EBM power cable(s) into the battery connector(s). Up to four EBMs
2. Verify that the EBM connections are tight and that strain relief exists for each
3. Connect the battery detection cable(s) to the connector of the UPS and of the
4. Check that the battery circuit breaker is switched to the "I" (on) position.

Rack installation

Preparing the EBM for rack mounting

About this task
Note: This step requires two people.
The Extended Battery Module is very heavy. To ease its rack mounting, you can
remove the battery packs from the EBM by following these steps.
Procedure
1. Remove the center section of the front bezel.
2. Remove the four captive screws to open the front bezel.
Rack kit for 19-inch enclosures -- including square nuts and screws (
Tower and Wall mounting kit (including 2 ears and screws)
can be connected to the UPS.
cable.
EBM(s).
)
21
Chapter 3. Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rt11.0va

Table of Contents