UPS connection: AX models

About this task
Note: Check that the indications on the name plate located on the back of the UPS
correspond to the AC-power source and the true electrical consumption of the total
load.
Note: The UPS charges the battery packs as soon as it is connected to the
AC-power source, even if the
Procedure
1. Connect the UPS input plug
2. Connect the loads to the UPS. It is preferable to connect the critical loads to the
3. To program shutdown of outlets
What to do next
After the UPS is connected to the AC power source, eight hours of charging is
required before the battery packs can supply the rated backup time.

UPS connection: KX models

About this task
Note: Check that the indications on the name plate located on the back of the UPS
correspond to the AC-power source and the true electrical consumption of the total
load.
Primary outlet group shown as
Group 1 or Group 2 outlets shown as
programmed to shed loads as desired. For the 5594-3AX, 3kVA models, connect
any high-power device to the 30 A outlet.
optimize the available backup time, check the in/out settings (described in
Table 1 on page 13).
button is not pressed.
to the AC-power source.
and the non-critical loads to either the
. Group 1 and Group 2 outlets can be
during operation on battery power to
23