Wall Mounting Construction; Checking The Wall - Panasonic UB-T780 Operating Instructions Manual

Hide thumbs Also See for UB-T780:
Table of Contents

Advertisement

Installation Manual

Wall Mounting Construction

Checking the Wall

When mounting on a wall, consult with your building's owner, caretaker or construction manager to determine
if the wall strength is sufficient to install the elite Panaboard. For safety, install the elite Panaboard only after
thoroughly understanding the type of walls, the appropriate types of screws and the construction method (Page
38).
CAUTION
Do not attach the electronic board to mortared walls. Accidental electric leakage from the wall
mounting plate bolts to metal laths or wire laths can cause heat, smoke or fire.
I.
Necessary Tools and Parts (not included with the elite Panaboard)
Drill, Screwdriver, Measuring tape, Level
8 screws (M6 size)
II.
Before Starting
1.
Make sure that the wall is strong enough to support the elite Panaboard.
Rated strength: greater than 1,324 N (135 kgf)
Notice
If necessary, reinforce the wall so that it is strong enough to support the elite Panaboard.
2.
Make sure that the location is large enough to accommodate the elite Panaboard.
Height: greater than 2,100 mm (6 ft. 10
Width: greater than 2,000 mm (6 ft. 6
3.
Make sure that the AC outlet is within 3 m (9 ft. 10
mounted and that it will not be behind the elite Panaboard.
36
Operating Instructions (For Basic Operations)
/
in.)
5
8
/
in.)
3
4
/
in.) of where the elite Panaboard will be
1
8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents