Operating And Parametrizing; Start Up; Overview - Siemens 670 V2 Operating Instructions Manual

Table of Contents

Advertisement

Operating and parametrizing

8.1

Start up

8.1.1

Overview

Checklist
Before starting up the device for the first time, go through the following checklist:
• Have you taken into account the proper ambient and environmental conditions for the
• Have you found out how to connect the equipotential bonding?
• Have you found out how to connect the power supply?
• Read over this information in the respective "Connecting" chapter of the control unit and
Panel PC 670 V2/870 V2, Control unit
Operating Instructions, Edition 03/2004, CD Documentation and Drivers
device and the connected I/O modules, as described in the technical information?
computer unit operating instructions. Please follow all guidelines.
Caution
Condensation
When transporting the device at low temperatures, prevent condensation from forming on
or in the device. The same applies when the device is subjected to extreme changes in
temperature. Wait 12 hours before switching the device on.
Before starting up the device, allow it to adjust slowly to room temperature. Do not
subject it directly to heat radiation from a heating device, however.
I/O modules
Connect the I/O modules using shielded cable and metal plugs. Otherwise the operating
license expires. Secure the plug of the interface cable on the housing of the device. This
improves the electrical shielding.
Start up
Do not switch off the device during the start up. Otherwise parts of the software will be
lost which are necessary for trouble-free operation.
Use the default values in the BIOS. Otherwise the operating system will not be installed
properly.
8
8-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

870 v2

Table of Contents