ABB ACS800-02 Hardware Manual page 55

Acs800-02 drives (45 to 500 kw); acs800-u2 drives (60 to 600 hp)
Hide thumbs Also See for ACS800-02:
Table of Contents

Advertisement

Connect the cable lugs to the pedestal:
1. If the lead-through plate is fixed to the floor, undo the fixing screws.
2. Place the pedestal onto the lead-through plate.
3. Fasten the pedestal and the lead-through plate to the floor with the screws through the same holes.
4. Connect the cable lugs to the pedestal (U1, V1, W1, U2, V2, W2 and PE; optional brake resistor
cable lugs to UDC+/R+ and R-).
5. Tighten the connections.
View of frame size R7
4
Frame sizes R7 and R8: M12 (1/2 in.) bolt
Tightening torque: 50...75 Nm (37...55 lbf ft)
WARNING! It is not allowed to connect the cables directly to the drive module terminals.
The leadthrough insulation material is not strong enough to carry the mechanical stress
exerted by the cables. The cable connections must be performed in the pedestal.
Wheel the drive frame back on the pedestal (See step Remove the pedestal).
55
5
Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs800-u2

Table of Contents