19. After setting the logical disk binding
parameters, a confirmation window will
appear. Review the settings and license
information listed, and if everything is
correct, click Set. Otherwise, click Back
and configure the proper settings before
continuing.
20. After configuring logical disks and
confirming that all settings are correct,
the array will begin setting the
configuration and building any logical
disks that may have been configured.
When the initialization process is
complete, an Initialization Complete
window will appear.
At this point, click Finish to complete
the initialization, and then confirm that
all configured logical drives and
application servers are connected
through the Storage Manager client.
NEC D3/D4 Quick Start Guide
30