Step 2: Complete The Identification Records; Step 3: Select A Location For The Analyzer; Mounting Stand Installation - GE Sievers InnovOx Operation And Maintenance Manual

On-line toc analyzer
Hide thumbs Also See for Sievers InnovOx:
Table of Contents

Advertisement

Chapter 4: Installation
Mounting hardware to bolt Mounting Stand to wall or floor (if you ordered a Mounting Stand accessory)
Insulated wire (22-12 American Wire Gauge - AWG, rated to 300 Volts) for analog and alarm outputs
(optional; see "Step 6: Install Input/Output, Cables, and Accessories" on page 74.)
Analog (4-20 mA) recorder (optional)
Insulated wire (12-12 American Wire Gauge, rated to 300 Volts) for AC power conduit (see "Step 11: Turn
on Power and Configure Basic Settings" on page 86.)
An external circuit breaker or switch that disconnects both poles of the supply voltage, rated
appropriately

Step 2: Complete the Identification Records

Complete the Identification Records section on "Identification Records" on page 3 by recording the date of
installation and the Analyzer serial number (found on the side of the Analyzer).

Step 3: Select a Location for the Analyzer

Select a location in a well-ventilated area to avoid inhaling any toxic gases that may be emitted from the
Analyzer's waste. Place the Analyzer in a location away from direct sunlight and exposure to extreme
temperatures .
Operating at elevated temperatures (greater than 40 °C) prevents proper operation, and operating at low
temperatures (below 10 °C) can cause errors in the measurements or damage to the Analyzer.

Mounting Stand Installation

The InnovOx On-Line TOC Analyzer is designed to be mounted on a Mounting Stand or on a wall. For an
illustration of the required clearances for the Mounting Stand accessory, see Figure 2.
GE Analytical Instruments ©2012
WARNING
67 of 238
DLM 68100-06 EN Rev. A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents