DS2000 Configuration Guidelines
The total number of components you can install and connect depends on power supply capacity and the Sys-
tem Load Factor. Review the DS2000 Configuration Guidelines table below and DS2000 Load Factor Cal-
culations on page 1-6 when configuring your system.
4 Slot Cabinets
Do not install more than 2 16DSTU PCBs under any circumstances.
The first 16DDSTU PCB you install must be in the first slot (CN1).
Maximum configuration is
The total of all extensions and trunks cannot exceed
Always use the System Load Factor table to check your system configuration.
8 Slot Cabinets
Do not install more than 2 16DSTU PCBs for each power supply. (Install your power supplies in the
following order: slot CN101, slot CN103, slot CN102.)
The first 16DSTU PCB you install must be in the first slot (CN1).
The total of all extensions and trunks installed cannot exceed
Maximum configuration is
Always use the System Load Factor table to check your system configuration.
DS2000 Hardware Manual
System Preparation and Configuration
DS2000 Configuration Guidelines
64 ports
.
64
112
ports.
Section 1: Installing the Cabinet N 1-5
.
112
.
1