Components; Housing; Energy Management System (Ems) - Bosch BPT-S 5 Hybrid Installation Manual

Solar inverter with integrated battery
Hide thumbs Also See for BPT-S 5 Hybrid:
Table of Contents

Advertisement

Available languages

Available languages

40 | Technical description
Storage system | Installation manual
[2]
Housing cover
Prevents foreign bodies from entering the system
[3]

Energy management system (EMS)

Storage system display and control unit.
This comes pre-assembled on delivery.
[4]
Housing door
The On/Off switch for the storage system is located
behind the housing door.
USB ports (e.g. for installing updates) and the
terminals for the LAN and external components are
located under the switch.
The storage system connector block, which
connects the system to the in-house grid and the
public power grid, is located behind the guard plate.
Note: Never remove the guard plate. This may only
be removed by a trained electrician.
[5]
Guard plate
Supports the device's fire resistance
3.6

Components

3.6.1

Housing

The storage system housing contains all the storage
system components and the internal cables. The
battery cover is an integrated part of the housing. The
battery cover acts as a safety area by separating the
batteries from the other components.
3.6.2
Energy management system (EMS)
The energy management system (EMS) is the control
unit for the storage system. You can find the EMS pre-
assembled at the front of the storage system.
The EMS
regulates and secures the economical operation of
the storage system through integrated software
controls all energy flows within the system
English
Bosch Power Tec GmbH

Advertisement

Table of Contents
loading

Table of Contents