Select The Language - Bosch BPT-S 5 Hybrid Installation Manual

Solar inverter with integrated battery
Hide thumbs Also See for BPT-S 5 Hybrid:
Table of Contents

Advertisement

Available languages

Available languages

112 | Commissioning
Storage system | Installation manual
The storage system program starts up
automatically. This may take some time: A rotating
hourglass is displayed.
You will hear several clicking sounds.
Only during the initial commissioning of the
storage system: The commissioning wizard
launches.
4. Follow the on-screen instructions of the
commissioning wizard
Info
Once you have completed the instructions in the
commissioning wizard, this is not repeated when the
system is restarted.
The storage system has been switched on.
Info
In order to be able to use, store or feed the energy
that is generated by the photovoltaic system, you
must ensure that the DC disconnecting switch is
switched on.
8.2

Select the language

Prerequisites
The Language window is open.
English
Bosch Power Tec GmbH

Advertisement

Table of Contents
loading

Table of Contents