Bosch BPT-S 5 Hybrid Installation Manual page 222

Solar inverter with integrated battery
Hide thumbs Also See for BPT-S 5 Hybrid:
Table of Contents

Advertisement

Available languages

Available languages

78 | Installation
Storage system | Installation manual
(1)
(2)
Backup line out (1) and intermediate circuit cable
6.18:
(DC Link) (2) terminals on the battery converter
6.19:
Internal distribution box: 4-core cable to terminals
1-4; 2-core cable to terminals 5-6
Info
The copper foil on the cables must be visible in equal
amounts on the feeds at the top and bottom
(important for EMC protection).
4. Tighten the EMC screw connection
The battery converter is connected to the internal
distribution box.
1
2
3
4
5
6
1
2
3 4 5
6
English
(2)
Bosch Power Tec GmbH

Advertisement

Table of Contents
loading

Table of Contents