Bosch BPT-S 5 Hybrid Installation Manual page 241

Solar inverter with integrated battery
Hide thumbs Also See for BPT-S 5 Hybrid:
Table of Contents

Advertisement

Available languages

Available languages

English
Bosch Power Tec GmbH
6.35:
Secure the earthing cable
2. Place the housing cover on top of the housing and
position the countersunk holes over the threads.
3. Use the 4 mm Allen key to screw down the cover
with eight M6 countersunk screws (tightening
torque: on the corners: 2.7 Nm, in the centre: 0.1
Nm)
6.36:
Screw down the housing cover
The housing cover is installed.
Installation | 97
Storage system | Installation manual

Advertisement

Table of Contents
loading

Table of Contents