...5 CONTROL OPERATION
...5.9 Introduction to Standard Control
Decrease Proportional Band
Response Time
Time
28
Initial Settings
Proportional Band = 100%
Integral Action Time = OFF
Derivative Action Time = OFF
Adjust the set point a small amount
Hold the set point at the new value until
the process begins to move
Reset the set point to the original value
Observe response of process
Response Time
Note Proportional Band value (PBc)
Measure the critical cycle time (tc)
Calculate Terms
P
P
P+I
2 x PBc
2.2 x PBc
I
tc/1.2
D
Fig. 5.17 Manual Tuning
Critical
Cycle time (tcc)
P+D
P+I+D
1.6 x PBc
1.6 x PBc
tc/2
tc/2
tc/12
tc/8
Increase Proportional Band
Response Time
Time