Advisory Test Equipment - GE MiCOM P40 Agile Technical Manual

Feeder management ied
Hide thumbs Also See for MiCOM P40 Agile:
Table of Contents

Advertisement

P14x
4.3

ADVISORY TEST EQUIPMENT

Advisory test equipment may be required for extended commissioning procedures:
Current clamp meter
Multi-finger test plug:
P992 for test block type P991
MMLB for test block type MMLG blocks
Electronic or brushless insulation tester with a DC output not exceeding 500 V
KITZ K-Bus - EIA(RS)232 protocol converter for testing EIA(RS)485 K-Bus port
EIA(RS)485 to EIA(RS)232 converter for testing EIA(RS)485 Courier/MODBUS/IEC60870-5-103/DNP3 port
A portable printer (for printing a setting record from the portable PC) and or writeable, detachable memory
device.
Phase angle meter
Phase rotation meter
Fibre-optic power meter.
Fibre optic test leads (minimum 2). 10m minimum length, multimode 50/125 µm or 62.5µm terminated with
BFOC (ST) 2.5 connectors for testing the fibre-optic RP1 port.
P14xEd1-TM-EN-1
Chapter 21 - Commissioning Instructions
495

Advertisement

Table of Contents
loading

Table of Contents